Site work and renovation of a clubhouse / community center in Detroit, Michigan. Completed plans call for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.

Design-build services for HVAC upgrades including rooftop unit replacement. Question Deadline 09/29/2026 at 2:00 PM ET All questions must be submitted online in the Supplier Portal The major improvement tasks for this project includes by not limited to: HVAC Niagara controls City of Detroit Office of Contracting and Procurement (OCP) Request for Proposal # 549815 - CDD Northwest Activities Center (NWAC) RTU Replacement Remove and replace existing rooftop units (RTUs) Remove and reconnect electrical services to support the HVAC equipment, as needed Remove and reconnect plumbing and gas lines to support the HVAC equipment, as needed Remove and reconnect fire alarm systems (if sensors are located in rooftop units) Abatement, as needed Roof repairs resulting from RTU installation, including but not limited to curb adapters and roof curb installation Equipment removal and disposal Temporary covers and safety measures HVAC Upgrades: HVAC upgrades will be performed on a design-build basis. Scope may vary pending CDD's review and approval. Provide a complete assessment of the existing RTUs, VAVs, and control system. Report to CDD the findings and recommendations. Once recommendations are reviewed and approved by owner, implement approved scope for RTUS, VAVs, and control system. If approved, provide a complete DDC system for rooftop units, integrated with the city's front-end Niagara Tridium control system. New RTUs to be Carrier or York or equivalent. Repair of any pavement, concrete, siding, landscaping caused by demolition, removal, and construction activities. Perform complete duct cleaning throughout Perform complete air balance throughout Conduct certified commissioning of all equipment. Confirm gas pressure is within specification, verify voltage and phase rotation are correct, and check that airflow meets required levels. Run functional tests on all controls to confirm they operate as intended.

Sub-Bidding

$330,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
162
Bidding Soon
2,651
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2026

November 4, 2026

Project location map

18100 Meyers Rd, Detroit, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.