Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 30, 2026 at 8:00 PM

Updated November 5, 2026

Demolition, site work and renovation of a water / sewer project in Pensacola, Florida. Completed plans call for the renovation of a water / sewer project; and for the demolition of a water / sewer project.

Scope- Lift Station and Site 1. Removal and demolition of multiple components including an existing solids tank 2. Bypassing AND OPERATION of the existing lift station during construction until ECUA takes ownership 3. Installation of a new manhole and piping to reconnect the lift station 4. Modification of the existing wet well including a new top 5. Installation of a new pump pad and electrical rack 6. Site improvements including a new driveway, fence, grassing, gates, driveway approach, and gravel treatment 7. Stormwater management 8. Relocation of a telephone pedestal 9. Contractor is responsible for all debris and spoil as well as new fill required . Please note that the intent is for grade to remain and driveway improvements will generate spoil. 10. The wet well has an existing liner and that shall be maintained. 11. Any equipment, i.e. pumps, panels, etc at the existing site may be recovered by ECUA however it is at ECUA's discretion. Should ECUA choose to not take ownership of those items the Contractor shall retain ownership and/or dispose of them. 12. Notification for testing and startups shall be in accordance with ECUA's Engineering Manual. B. Sewer Lift Station and Force Main 1. ECUA will be providing the pumps , panels, floats, etc 2. ECUA will not be providing the base ells, rails, and hatch. Those will be supplied by the Contractor and coordinated with ECUA's pump selection. 3. The Contractor shall install the ECUA provided material and all other components needed to complete a functioning station in accordance with the plans and specifications. 4. Existing conduit feed to be repurposed and a new future conduit to be added. 5. Existing water service line to be upgraded. 6. Existing sewer force main to remain and be reconnected. 7. The Contractor may utilize a temporary tap, if so desired , to facilitate station construction. No separate payment will be made for this activity. 8. The Contractor shall operate the station for the entirety of the construction period . ECUA will not provide assistance. 9. The Contractor shall coordinate meter connection/reconnection with ECUA. 10. The Contractor is responsible for all temporary utilities, laydown, and all other items needed to complete the project. 11. Strict compliance with 28 day compressive design strength will be enforced. 12. Solid residuals from the solids tank, i.e. sewer solids, can be received at an appropriate ECUA receiving station. ECUA is not responsible for transportation. 13. ECUA is not responsible for construction debris, demolition debris, and other residuals. The Contractor shall dispose of such items in accordance with all federal, state, and local rules and regulations Bonds: 5% Bid Bond, 100% Performance Bond. As per Addendum 2 QA deadline is -10/13/2026 03:00 PM Questions must be submitted in writing via email to the Purchasing and Stores Division at Bids@ecua.fl.gov or during the pre-bid conference

Award

$88,700.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
58
Bidding Soon
950
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2026

November 2, 2026

Project location map

Mint Julep Trail, Pensacola, FL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed