BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 11, 2026

Site work for a water / sewer project in Morgantown, West Virginia. Completed plans call for site work for a water / sewer project.

The work includes construction of +/- 4,450 LF of 8" HDPE water line, +/- 3,000 LF of 8" PVC water line, +/- 5,020 LF of 6" PVC water line, +/- 890 LF of 4" HDPE water line, +/- 3,770 LF of 2" HDPE water line, four (4) fire hydrants, twenty-eight (28) water service and pits, one (1) pressure reducing vault and other related appurtenances. Only Plan Holders of Record may be allowed to submit official bids. Bidding Documents must be paid for and obtained. Overnight mailing of Bidding Documents will not be provided. Bidding Documents may be examined at the following locations: Morgantown Utility Board 278 Greenbag Road Morgantown, WV 26507-0852. Please contact Tammi Kennedy or Cory Jones to purchase (304-292-8443). All Bids submitted via U.S. Postal service must be addressed to Morgantown Utility Board, P.O. Box 852, Morgantown, West Virginia 26507-0852. All Bids hand-delivered or submitted via commercial carrier (such as UPS or Federal Express) must be addressed to Morgantown Utility Board, 278 Greenbag Road, Morgantown, West Virginia 26501. No Bid will be received unless accompanied by a Bid Bond equal to at least five percent of the Bid, payable to the Owner as a guarantee that after a Bid is accepted, Bidder will execute and file the Agreement, Insurance Certificate, and 100% Performance and Payment Bonds within fifteen days after the Notice of Award. Bids will be accepted from only those Bidders who obtain Documents from the Owner. Owner will transmit to all prospective Bidders of record such Addenda as Owner considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. Bids will be accepted only from those Bidders who have attended the pre-bid conference. The Morgantown Utility Board reserves the right to reject any or all Bids, to waive any informality and/or technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 120 days after the time set for opening Bids.

GC Bidding

$2,500,000.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
100
Bidding Soon
1,807
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2026

November 13, 2026

Project location map

Morgans Run Road, Morgantown, WV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.