BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 12, 2026

Demolition, site work and renovation of a water / sewer project in Harrisonville, Missouri. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Removal of 166 LF of 60-inch diameter CMP and replacement with 166 LF of 60-inch diameter HDPE pipe, including mobilization, traffic control, grading, and site restoration. Bonds: Bid Bond required (unspecified amount). Sw 2025 02 203 Andrea Lane 60-inch Storm Water Replacement Pipe. Scope Of Work The work to be performed under the provisions of these Contract Documents, Plans, and Specifications shall be consistent with "REGULATIONS OF THE CONTRACT" in the construction, installation, and completion of all work required in connection with the 203 ANDREA LANE STORM WATER IMPROVEMENTS PROJECT in Harrisonville, Missouri.

GC Bidding

$106,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
62
Bidding Soon
1,155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.