Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 3, 2026

Demolition, site work and new construction of a bridge / tunnel in Spivey, Kansas. Completed plans call for the construction of a bridge / tunnel; for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

The project consists of grading and bridge at Bridge OS U.0-19.7 (1.0 miles W and 0.5 miles N of Rago over Red Creek on SE 10th Avenue. Kingman County shall provide all of the funds required for this project. All Federal, State and County regulations must be complied with. Bonds: 5% Bid Bond, Certified Check required Question Deadline 09/22/2026 Questions regarding bids shall be directed in writing to Josh Dlabal, jdlabal@kirkham.com a minimum of two (2) calendar days prior to the date of the bid opening.

Bid Results

$465,939.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
18
Bidding Soon
484
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2026

July 26, 2027

Project location map

SE 10 Ave, Spivey, KS

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed