BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 10, 2026

Renovation of a mixed-use development in Shiprock, New Mexico. Completed plans call for the renovation of a medical facility.

Questions are due no later than 9/4/2026 at 2:00PM ( MDT ) via email, only, to Rodney . Brown@ihs.gov . Verbal questions/inquiries will not be acknowledged or accepted. The objective of this project is to complete the modernization of AHU #5 by installing equipment that is fully compatible with the newly upgraded MicroTech III control system. The project includes: Replacement of two Variable Frequency Drives (VFDs), one for the supply fan motor and one for the return fan motor. Replacement of one electronic hot water valve actuator. Integration and commissioning of the new VFDs and actuator with the upgraded MicroTech III control board. Verification of proper communication, control sequences, and operational performance of the air handling unit. Upon completion, the upgraded components will work in conjunction with the new control circuitry to improve system reliability, optimize airflow control, enhance energy efficiency, and extend the operational life of the existing AHU #5 serving the Facilities Shop and General Services areas.

Sub-Bidding

$100,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
6
Bidding Soon
191
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

September 15, 2026

Project location map

US-491, Shiprock, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.