BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 14, 2026

Demolition, site work and new construction of a bridge / tunnel in Vine Grove, Kentucky. Completed plans call for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Removal of existing bridge structure and abutments; construction of new bridge abutments; installation of concrete box beams; construction of concrete bridge deck; clearing, excavation, earthwork, grading; installation of guardrail; maintenance of traffic; roadway approach modification; restoration and seeding. Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Question Deadline 09/17/2026 at 5:00 PM ET Questions pertaining to the plans and specifications shall be directed to Mr. Tony Marconi, P.E. via email at tmarconi@heritageeng.com or (502) 562-1412, ext. 1226.

GC Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
85
Bidding Soon
1,243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2026

November 24, 2026

Project location map

Creekvale Dr, Vine Grove, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.