BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2026 at 8:00 PM

Updated September 16, 2026

Site work and paving for a mixed-use development in Kirksville, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed work includes: Traffic Control; Approximately 2,289 square feet of Removal & Disposal of Existing Improvements; 61 cubic yards Cut Embankment from City Stockpile; 387 cubic yards Fill Embankment; 9,111 square feet of 4 thick concrete sidewalk Macro Synthetic Fiber Reinforced over 4 rolled stone base; 471 square feet of ADA compliant Sidewalk Ramp Macro Synthetic Fiber Reinforced over 4 rolled stone base; 60 linear feet of Handrail; 63 linear feet 6" Semi-mountable Curb and Gutter; 309 square feet of 2 wide Square Curb and Gutter; 25 linear feet of 3 wide Square Curb and Gutter; 915 square feet of 8" thick concrete slab with 6 thick Type 5 base; 402 linear feet of 12" diameter Corrugated HDPE Storm Pipe; 3 each 12" diameter Flared End Section; 2 each 2'x3' Curb Inlet and Basin; 12,783 square feet of fertilizing, seeding, and mulching and related surface restoration including grading. All bidders must be on MoDOTs Qualified Contractor List per section 102.2 of the 2026 Missouri Standard Specifications for Highway Construction, effective July 1, 2026. The contractor questionnaire must be on file 7 days prior to bid opening. On this public works project no 2nd tier subcontracting will be allowed. Project Contact for Contractor/Bidder Questions All questions concerning this project during the bidding process shall be forwarded to the project contact listed below. Linda Jepson, Project Contact City of Kirksville 201 S. Franklin Street Kirksville, MO 63501 Telephone Number: 660-627-1225 Email : ljepson@kirksville.gov The City of Kirksville reserves the right to reject any and all bids MO DOT - Rotary Park Connectivity Project

GC Bidding

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
14
Bidding Soon
344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

November 30, 2026

Project location map

1115 Country Club Dr, Kirksville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.