Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 12, 2026 at 8:00 PM

Updated September 18, 2026

Renovation of a detention facility in Safford, Arizona. Completed plans call for the renovation of a detention facility.

Supply, delivery, and installation solution including all equipment, materials, labor, supervision, tools, and incidentals required for one (1) new fully functional X-ray machine system and removal of existing X-ray system meeting the requirements of the specifications. The scope for this project will be to supply and install one (1) new Acuity UDR U-Arm System and remove existing GE Definium 5000 X-Ray system at FCI Safford The offeror shall email questions concerning sensitive technology to the Department of State at CISADA106@state.gov. All specified parts and materials must meet current industry standards. If proposing an alternative product, the contractor must provide detailed technical specifications, costs, installation requirements, and availability for review and approval. The government reserves the right to determine if the product is equal to or better than the specified item. Awarded contractor shall be a reputable company where all installers/technicians shall be qualified and certified by the manufacture to install, test, and certify the new x-ray system. valid and current contracting license, federally vetted and approved, to install such systems. If required, the contractor, including sub-contractor personnel, shall have applicable certifications or proof of experience detailed in public records, reflecting competency in executing such project. The Contractor shall provide the Institution's Contracting Officer and his Representative (COR) with such proof upon request. All work and materials must comply with applicable local, state, and federal codes, including the latest editions of the International Building Code, National Plumbing Code, National Electrical Code, NFPA, Life Safety Code, OSHA, American Correctional Association Standards, and other relevant regulations. In addition, all work shall be performed in accordance with industry best practices, ensuring high-quality craftsmanship, durability, and safety. Period of Performance: The installation of all equipment, and delivery of all products must be completed with 133 calendar days of contract award.

Post-Bid

$500,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
13
Bidding Soon
223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed