Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 16, 2026 at 8:00 PM

Updated September 21, 2026

Remodeling of a municipal facility in Little Rock, Arkansas. Completed plans call for the remodel of a municipal facility.

Remodel of the Fourche Creek Maintenance Building. Question Deadline 09/21/2026 at 4:00 PM CT Question submitted Electronically A1.5 DEMOLITION The Vendor shall: A. Remove and properly dispose of all existing ceiling grids throughout the Maintenance Building. Page 3 of 18 B. Remove all existing flooring throughout the building, except for the ceramic tile flooring in the men's and women's restroom areas. C. Remove existing cabinets and fixtures in the men's and women's restrooms. D. Protect existing adjacent surfaces, walls, and equipment from damage during demolition activities. E. Evaluate and account for material lead times to ensure proper sequencing of work, prior to commencement of demolition activities. Once material availability and scheduling have been established, work may proceed in an orderly and timely manner. A1.6 MECHANICAL (HVAC) The Vendor shall: A. Remove and reconfigure existing HVAC ductwork as required to accommodate the new ceiling configuration and layout. B. Installation of new ductwork shall be properly supported , sealed, and balanced to ensure efficient system operation. A1.7 INSULATION A1.8 A. Mechanical Area - Ceiling Insulation: The Vendor shall install closed-cell spray foam insulation at the ceiling within the mechanical area after removal of existing ceiling materials. Insulation shall be installed to achieve the required thermal performance and provide continuous air-sealing. Upon completion , the spray foam insulation shall be painted, and all finished surfaces shall match the existing interior building color scheme and appearance, including the light gray finishB. Ceiling Insulation: The Vendor shall: Install closed-cell spray foam insulation at the ceiling area after removal of existing ceiling materials and completion of all HVAC ductwork modifications. The Vendor shall ensure insulation is installed to achieve the required thermal performance and provide continuous air-sealing. Install closed-cell spray foam insulation at the ceiling areas with a minimum thermal performance of R-30, or greater as required to meet applicable building and energy code requirements. Insulation thickness must be in accordance with the manufacturer's published R-value per inch to achieve the specified performance. The Vendor shall ensure all materials and installation methods comply with applicable codes and manufacturer recommendations.

GC Bidding

$500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
36
Bidding Soon
468
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

November 9, 2026

Project location map

9500 Birdwood Dr, Little Rock, AR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed