Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2026 at 8:00 PM

Updated October 19, 2026

Demolition, site work and new construction of a development in Flaming Gorge, Utah. Completed plans call for the demolition of a development; and for the construction of a development.

**As of October 13, 2026, the project was awarded to Brown Outdoor Builds, with an awarded amount of $65,739.56 ** Utah Division of Wildlife Resources (UDWR) is acquiring services in this contract to provide fencing for habitat protection at Little Hole on the northside of Diamond Mountain in Daggett County, Utah. Project work will start with the removal of 0.8 miles of barbed wire, wood braced and t-post style fencing along the Green River corridor. Old fence materials should be hauled off and recycled or reused by the contractor. The contractor will then re-construct the same 0.8 miles or 4,224 ft section of fencing using welded drill pipe and succor rod, with exception to 120 ft section that crosses Gorge Creek on the west end. This section will be replaced with t-post/wire, due to the steepness of the terrain. Three 16-foot, 16-gauge Powder River gates, provided by the contractor, will be welded onto the new fence line at the current gate locations. The existing steel posts with concrete may be reused for the three gates. In addition, 375 ft of new pipe fencing will be attached to the new fence and added around the Davenport Recreation site. Five steel crossovers, already at their desired locations, will also be welded to the new pipe fence. The contractor will provide three gates, drill pipe posts, top rail, succor rod, metal clips, expansion joints, concrete, and all welding supplies and hydraulic post pounding equipment. Bids should be submitted on a per/foot basis with a total project cost. Question Deadline 09/08/2026 at 2:00 PM MT Question Deadline 09/08/2026 at 2:00 PM MT

Award

$65,739.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
8
Bidding Soon
105
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

September 15, 2026

Project location map

Green River, Flaming Gorge, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed