Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 11, 2026

Site work and renovation of an educational facility in Bakersfield, California. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

The scope of work shall include all labor, materials, equipment, supervision, and coordination required to demolish the existing scoreboards and install the new district-provided Daktronics scoreboards. Work shall include, but not be limited to, demolition and removal of the existing scoreboard and support columns; chipping out and removal of existing below-grade footings to a minimum depth of 6-12 inches; furnishing and installation of new concrete foundations and steel support columns; installation of underground conduits and concrete paving; setting and installation of the new scoreboard; installation of electrical conduits, conductors, pull boxes, grounding systems, and associated power and control connections. Contractor shall provide all necessary connections, terminations, testing, and coordination required to deliver a complete, operational, and fully functional scoreboard installation. Contractor shall coordinate with the scoreboard manufacturer for commissioning, startup, testing, and final system acceptance. Question Deadline 09/23/2026 All questions shall be submitted in writing via email to Sandy Castorena (sandy castorena@kernhigh.org ) Rafael Ferreira Principal Rafaelf@4-Creeks.com Sonia Orozco Project Manager soniao@4-creeks.com The Project: All labor, materials, & equipment required for the placement of one (1) 12' x 16' DSA prescoreboard replacement for the softball field and one ( 1 ) 12' x 20' DSA pre-checked scoreboard replacement for the baseball field. Power, data, and site work as required at Frontier High School. Work includes, but is not limited to, demolition of existing scoreboards & concrete column foundations as required. Existing underground utilities to remain. Provide and install site grading, concrete piers, relocate utilities (where necessary), trenching, underground conduits & connecting all power, signal, grounds & all required utility service hook-ups to the structures; the contractor shall coordinate with manufacturer(s) for a complete and functional installation. Contractor to remove and dispose of all spoils, scrap conduit, irrigation lines. All trash generated to be disposed of by contractor. B. Active Campus: Bidders shall take into consideration that the campus is currently occupied and shall maintain all systems functional during business hours. The contractor shall closely coordinate construction activities with the Owner's School Schedule and provide the necessary measures for safe student and staff circulation. Installation of varsity baseball and softball scoreboards. Set-asides: 3% DVBE.

Bid Results

$101,600.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
34
Bidding Soon
784
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

November 9, 2026

Project location map

6401 Allen Rd, Bakersfield, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed