BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 12, 2026

Renovation of a water / sewer project in District 23, Ballenger, Maryland. Conceptual plans call for the renovation of a water / sewer project.

The Discovery Sewage Pump Station (SPS) is an aging wastewater facility that has reached the end of its effective service life. Due to increasing maintenance needs, equipment obsolescence, and capacity limitations, a comprehensive evaluation of the station is required to determine the most reliable and cost-effective long-term solution. This project will begin with a conceptual study evaluating multiple alternatives, including: Relocation of the pump station to a more suitable site. Rerouting or modification of the existing force main. Expansion of the existing facility to accommodate current and future flows. Upgrading the existing station in place with modern mechanical, electrical, and control systems. Based on the findings of the conceptual study and the recommended alternative, the project will advance to full engineering design, permitting, and construction. The selected improvements will ensure the station meets current regulatory requirements, improves operational reliability, and supports long term system capacity needs. The project is included in the City's 2027-2032 Capital Improvement Program (CIP). As of September 08, 2026 , further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

$3,000,000.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
608
Active Projects
231
Bidding Soon
4,068
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2029

Project location map

To Be Determined, District 23, Ballenger, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.