BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2026 at 8:00 PM

Updated September 13, 2026

Renovation of an educational facility in Saint-Hyacinthe, Quebec. Completed plans call for the renovation of a educational facility.

Reference number: 20169390 Deadline for receipt of complaints 2026-09-22 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Estimated contract price range 368 000 $ à 653 199 $ Expected duration of the contract without options (in months) 9 Description The works include, but are not limited to, the replacement of the fire curtain, the addition of partitions, doors and door frames, and the sealing of openings in the existing fire barriers. A site visit is OPTIONAL and may be carried out until 18 September 2026. Any tenderer wishing to visit the site must contact the project manager at least 48 hours before the desired visit date to arrange an appointment. Delivery schedule Start of works: 1 June 2027 (some works may commence from 17 May 2027) Completion of works: 13 August 2027 (acceptance of the works without reservation - complete project). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$653,199.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
283
Bidding Soon
3,105
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2026

June 1, 2027

Project location map

3000 Av. Boullé, Saint-Hyacinthe, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.