Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2026 at 7:00 PM

Updated November 21, 2026

Site work and paving for a bridge / tunnel in Moab, Utah. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The scope of work included a geotechnical investigation, analysis, and recommendations for bridge foundations for use in design and construction. This involved several tasks including field reconnaissance, subsurface sampling, laboratory testing, interpretation and correlation of field measurements, and geotechnical engineering analysis. Specifically, this investigation was conducted to determine the soil profile at the bridge location and develop recommendations concerning bridge foundations, retaining structures, geologic hazards, and construction considerations. A hydraulics report has been prepared under separate cover by the CFLHD Hydraulics Engineer. The hydraulics report includes discussion of flood impacts, such as bridge scour and water surface elevations. Question Deadline 11/02/2026 at 4:00 PM MT Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions. Questions can be submitted to CFLContracts@dot.gov. This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100' span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. Total estimated cost between $10,000,000 and $20,000,000 . The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. As per PBMM Technical Questions accepted until November 2nd @ 4:00pm MST

GC Bidding

$20,000,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
9
Bidding Soon
106
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed