Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 9, 2026 at 7:00 PM

Updated November 11, 2026

Site work and new construction of a power facility in Pinellas Park, Florida. Completed plans call for the construction of a power facility; and for site work for a power facility.

27-0075-RFQ-DB The County intends to select and enter into a contract with the proposer whose proposal is determined in the sole judgment of the County to be in the best interest of the County. To be eligible to enter into the Service Agreement with the County, such Proposer must continue to meet all of the Minimum Qualifications Criteria contained in this Request for Qualifications (RFQ) from the date the Statement of Qualifications is submitted until the day the Service Agreement is signed by the County. The Solid Waste Disposal Complex, as defined for this project, comprises multiple county-owned facilities and site utility services. Key facilities include - a Waste-to-Energy (WTE) facility, mosquito control operations, sheriff's training facilities, and an industrial water treatment facility, administrative building, Household Hazardous Waste Center, maintenance buildings, landfill contractors' buildings, WTE administration and education center, and multiple pump stations and other electrical users - each currently served by separate electric services from Duke Energy. The County intends to consolidate and modernize its electrical infrastructure by constructing a centralized microgrid. The Microgrid will: Include a new switchgear building elevated above the 500-year floodplain. Feature advanced distribution infrastructure (overhead and underground) and replace all Duke-provided services and transformers with Microgrid services and infrastructure. Refer to Figures. No. 1, 2-1, 2-2, and 2-3, 3-1, 3-2, and 3-3 in the attached Design-Criteria Package for existing transformer, meter, and service locations where new on-site microgrid distribution and service infrastructure is required. Be designed and constructed in compliance with the Florida Building Code, NEC, NESC, and other applicable standards. Integrate a Waste-to-Energy facility, a floating photovoltaic (PV) array (estimated 5 MW capacity), and electric utility services to power county facilities and site service needs. The design-builder shall design and construct the infrastructure needed to integrate these Distributed Energy Resources (DERs). Question Submission Deadline:November 20, 2026, 3:00pm

GC Bidding

$3,000,000.00

Public - County

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
122
Bidding Soon
1,846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2026

August 2, 2027

Project location map

3095 114th Ave, Pinellas Park, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed