Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 3, 2026 at 8:00 PM

Updated October 9, 2026

Renovation of a laboratory facility in Geneva, Illinois. Completed plans call for the renovation of a laboratory facility.

CUB Boiler 1 PC Replacement - 1. Removal and replacement of physical components. 2. Convert the existing PLC program to use in new controller, 3. Configure new HMI 4. Remove and replace 3 servo motors and calibrate. The Subcontractor shall perform all work as described in the Statement of Work titled the, "CUB Boiler 1 PLC Replacement" All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision Question Deadline 09/14/2026 at 8:00 AM CT All questions concerning this RFP should be submitted in writing and directed to the Procurement Specialist Dasia Guthrie (630) 840-2494 dguthrie@fnal.gov Fermi Forward Discovery Group, LLC Procurement Department Kirk Road & Wilson Street Batavia, IL 60510-0500 90 Calendar Days - Project Complete Site Arrival Mobilize technician to jobsite, during normal working hours. Attend site specific safety training, as required by Fermi Lab. Attain safe work permits as /if required by Fermi Lab. Check in with boiler operators and move into boiler room. Perform LOTO of affected utilities. HMI and PLC Replacement Remove old obsolete HMI and PLC and replace it with new updated components. Provide new programs for new components and verify operation and commissioning. Replace Old Obsolete Pulse Servos Remove old Air Damper, Gas Valve, and FGR Actuator Servos with new Modbus Servos. Provide new mounting and bracketing material to complete the conversion. Verify combustion and servo positions for new installation. Demobilization Remove any LOTO tags/locks used to isolate equipment. Provide customers with Service Tickets/Report of work performed. The Contractor shall: Remove existing EOL PLC controller and HMI in Boiler 1 and upgrade it to a newer version. The new PLC/HMI set shall maintain the existing program and continue to maintain the existing mapped integrated points list through the existing Protnide. In addition, the Air Damper, Gas Valve and FGR actuator servo motors will be replaced from pulsed to MODBus servos. Appropriate mounting, bracketing and modifications for conversion are to be included. Delnor Community Hospital 300 Randall Rd. Geneva IL 60134 Northwestern Medicine Occupational Health 2635 Church Road , #105 Aurora IL 60502 Presence Mercy Medical Cen 1325 N Highland Ave. Aurora IL 60506 Cadence Occupational Health 636 Raymond Dr. #102 Naperville IL 60563 Central DuPage Hospital 25 Winfie;d Rd #500 Winfield IL 60190

Post-Bid

$470,000.00

Public - Federal

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
588
Active Projects
300
Bidding Soon
3,961
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2026

December 1, 2026

Project location map

Multiple Locations, Geneva, IL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed