Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 13, 2026 at 8:00 PM

Updated October 6, 2026

Renovation of a museum in Calgary, Alberta. Completed plans call for the renovation of a museum.

The Glenbow Renovation Project - P4.03 Theatre Fit-Out will include interior fit-out of the theatre space of Levels 1 and 2 to support the future function of the building. Included in the scope is the renovation/adjustment of existing Mechanical and Electrical systems and the addition of theatrical equipment to support the intended use of the space as a theatre. The work is scheduled for construction between November 2026 and May 2027. The Theatre Fit-Out Package comprises an isolated portion of the Glenbow Museum, accessible from the ground floor at the south-east corner of the building. The Work encompasses approximately 14,000 square feet of usable floor area across two levels, including a partially open floor plate, raked auditorium slab, and extensive exterior curtain wall system that provides natural light into the space. The interior fit-out is budgeted as a $4 million construction scope and includes detailed architectural finishes incorporating soft and natural materials to compliment the exposed structural features of the base building and the industrial feel of the visible system infrastructure. Upon completion, the space is intended to function as a flexible presentation and event venue, complete with the comfort, acoustic performance, and audio-visual capabilities associated with a modern auditorium or intimate theatre. The Construction Manager, EllisDon, is inviting Subcontractors to submit a Stipulated Price Bid (the Bid) to perform the following Trade-Scope Work packages: Div. 01 Construction Final Cleaning Div. 02 Selective Interior Demolition Div. 05 Metal Fabrications - Structural Steel Div. 05 Metal Fabrications - Metal Railings Div. 06 Ornamental Woodwork, Wood Veneer Wall Paneling, and Flush Wood Doors & Hardware Div. 07 Joint Sealant and Firestopping Div. 08 Steel Doors, Frames & Door Hardware Div. 08 Interior Glass & Glazing Div. 09 Steel Stud Framing & Gypsum Board Assemblies Div. 09 Interior Painting Div. 09 Wood Veneer Wallcoverings Div. 09 Resilient Sheet Good Flooring, Rubber Base & Transitions Div. 09 Tactile Surface Indicators & Stair Tread Inserts Div. 11 Motorized Rigging Trusses & Controls Div. 12 Theatrical Drapery & Controls Div. 12 Roller Window Shades & Controls Official bid documents must be obtained from www.merx.com Question Acceptance Deadline: 2026/09/22 02:00:00 PM MDT

Post-Bid

$4,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
20
Bidding Soon
524
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed