Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 1, 2026 at 8:00 PM

Updated October 7, 2026

Site work, new construction and renovation of a mixed-use development in Middleborough, Massachusetts. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and for the renovation of a parking garage.

Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Sub Bid Category Electrical, HVAC The Project consists of: All work indicated in the contract drawings and specifications with the intent of constructing a new wood framed storage building, parking lot improvements, and memorial plaza. A new single story wood framed, shingle and metal panel sided building on frost wall foundation with asphalt shingle roofing. New mechanical and electrical systems. Modifications to an existing parking lot for increased parking and access to the new building. Relocation of a memorial plaza with new paving and reuse of existing paving for stone walls. Compliance with Conservation Order of Conditions. Project Scope of Work: This scope of work is provided to the General Contractor as a convenience, it is not intended to limit the scope of work outlined in the Construction Documents. All work is related to: constructing a new wood framed storage building, parking lot improvements, and memorial plaza. A new single story wood framed, shingle and metal panel sided building on frost wall foundation with asphalt shingle roofing. New mechanical and electrical systems. New electrical service from an existing apartment building involving underground installation. Modifications to an existing parking lot for increased parking and access to the new building. Relocation of a memorial plaza with new paving and reuse of existing paving for stone walls. Compliance with Conservation Order of Conditions. Question Deadline 09/23/2026 Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Architect. The Architect will answer such requests if received seven (7) calendar days before the date for receipt of the bids.

Post-Bid

$327,460.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
701
Active Projects
302
Bidding Soon
4,562
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

October 30, 2026

Project location map

8 Benton St, Middleborough, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed