Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 10, 2026 at 8:00 PM
Updated September 15, 2026
Demolition, site work, paving and new construction of a bridge / tunnel in Joachim Township, Missouri. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge over Plattin Creek Project Length: 0.094 Miles Structural, Roadway, Surveying, and Environmental: Consultant shall be responsible for professional engineering services including the preparation of preliminary plans, right-of-way and easement plats, final construction plans, technical specifications and construction cost estimation. As part of preparing the plans the consultant may need to perform field surveys, and archaeological or environmental studies. The consultant shall also be responsible for a limited number of construction engineering services including; site inspections, project management, review of shop drawings and material certifications, perform any needed drawing revisions and respond to requests for information from both the Contractor and the County. The method of Contractor Selection has not been Determined at this time. MO DOT - RFQ Engineering - Harness Road Bridge Replacement
Conceptual
$2,400,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 27, 2027
Harness Rd, Joachim Township, MO
Related To This Project
Joachim Township, MO
--
Joachim Township, MO
--
Joachim Township, MO
--
Joachim Township, MO
Bid Date: Jul 23 2026
Joachim Township, MO
--
Joachim Township, MO
Bid Date: Apr 09 2024
Joachim Township, MO
--
Joachim Township, MO
--
Joachim Township, MO
Bid Date: Oct 14 2021
Joachim Township, MO
Bid Date: Sep 12 2023
Joachim Township, MO
Bid Date: Jul 19 2022
Wentzville, MO
Bid Date: Oct 02 2026
High Ridge, MO
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed