BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 13, 2026 at 8:00 PM

Updated September 15, 2026

Renovation of a municipal facility in El Paso, Texas. Completed plans call for the renovation of a municipal facility.

Procurement, installation, training, and implementation of an integrated security management system. The contractor shall furnish a complete and functional security system, including all required labor, materials, and equipment. The selected vendor will be responsible for delivering, installing, testing, and supporting the system to ensure operational functionality. Any use of subcontractors or other vendors to install or maintain security system components, other than cabling, conduit, and power work, requires advance approval from DEA Headquarters, Physical Security Section. The proposed solution will be evaluated for technical accuracy, completeness, suitability, and overall capability to meet security requirements. GSA or open market pricing will be utilized, whichever is most advantageous to the Government. Installation of cabling equipment, testing and training associated with the security system shall be included. Work shall be coordinated with the General Contractor and other Subcontractors to meet the intended construction schedule. Under normal circumstances it is required that the system will be operational at least one week before occupying the space. Vendor will provide user training for the IDS, along with all user manuals, software if applicable, and keys for all systems Location of Work 660 MESA HILLS DRIVE, SUITE 200, EL PASO, TX 79912 Period of Performance: 09/30/2026 - 09/29/2027 ESS CONTROLLED DOORS 1. Card Reader with Keypad (IDV-9216AB terminal version) i. The following locations require card readers with integrated keypad: Prisoner Processing Door (Interior to Exterior) Prisoner Processing Interview Room 1 Door 1 (Interior to Hallway) Prisoner Processing Interview Room 2 Door 1 (Interior to Hallway) Warehouse Perimeter Door 1 (Exterior to interior) . Warehouse Perimeter Door 2 ( Exterior to interior) . Card Reader (IDV-9110AB terminal version) . The following locations require card readers: . First Floor: a. Room 1059 Door 1 (Exterior to Interior) b. Room 1059 Door 2 (Exterior to Interior) C. Intel (Room 1051) ( Hallway to Vestibule) d. Prisoner Processing Interview Room 1 Door 1 (Hallway to Interior) e. Prisoner Processing Interview Room 2 Door 1 (Hallway to Interior) f. Prisoner Processing Interview Room 1 Door 2 (Both Sides) g. Prisoner Processing Interview Room 2 Door 2 (Both Sides) h. Prisoner Processing Entrance (Hallway to Interior) i . Wire Room Vestibule Door (Both Sides) j. Wire Room (Room 1042) (Vestibule to Interior) k. Wire Room (Room 1042C) (Wire room to Office) I. MET Room (Hallway to Interior) Second Floor: a. Lobby Double Door (Elevator Lobby to Hallway) b. Lobby (Door 202) Single Door (Elevator Lobby to Lobby 201) C. Stairwell 1 (Door 201) (Stairwell to Hallway) d. Door 2003 (Lobby 201 to Hallway) e. Door 2003A (Lobby 201 to Hallway) f.Interview Room 2 (Secure Entry to Interview Room) g. Reception (Secure Entry to Reception) h. Imprest Room (Hallway to Interior) i . Secure Files (Hallway to Interior) j. CS Officer (Hallway to Interior) k. Open Area (Door 2096) (Hallway to Interior) I. Tech OPS (Open Area to Interior) m. Tech OPS Storage (Room 2031) (Tech OPS to Interior) n . Room 2038 (Open Area to Interior) 0. Group #4 Storage (Room 2053) (Open Area to Interior) p. Tech OPS Storage ( Room 2055) Door 1 (Open Area to Interior) q. Tech OPS Storage (Room 2055) Door 2 (Service Elevator Lobby to Interior) Open Area (Door 2048) (Hallway to Interior) Stairwell 3 (Door 226) (Stairwell to Hallway) DSO/Security Office (Hallway to Interior) Stairwell 2 (Door 225) (Stairwell to Hallway) Tech Office (Room 2074) (Hallway to Interior) Tech Supply (Room 2071) (Tech Office to Interior) Tech Closet (Room 2072) (Tech Office to Interior) OSA (Hallway to Interior) . SSU Door 1 (Hallway to Interior) . SSU Door 2 (Hallway to Interior) . Firebird Room (Hallway to Interior) . GSU/FPU Area Door 1 (Hallway to Interior) . GSU/FPU Area Door 2 (Hallway to Interior) . Open Area Room 2119 Door 1 ( Hallway 217 to Interior) . Open Area Room 2119 Door 2 (Hallway 217 to Interior) . Office in Room 2119 (Open Area to Interior) . Entrance to Diversion (Door 2057) (Hallway to Interior)

Sub-Bidding

$470,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
17
Bidding Soon
427
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

September 30, 2026

Project location map

660 S Mesa Hills Dr, El Paso, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.