Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2026 at 8:00 PM

Updated October 6, 2026

Site work and renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Upgrade of locker rooms at Chicago State University. The participation goal percentages on the amount of the contract awarded by CDB for this project are General Trade: 25% MBE, 5% WBE, 2% VBE/PBE. Questions submitted through the e-Builder module will not reviewed or responded to online The Chief Procurement Office (CPO) of the State of Illinois has allowed some preliminary work for Locker Room Remediation Project to be performed by the General Contractor for the Natatorium Structural Remediation Project by Proceed Order / Change Order. The work by others includes 1 ) Partial demolition of existing Natatorium Locker Rooms and related areas; and 2) Abatement of hazardous materials in the existing Natatorium Locker Rooms and related areas. Bidders shall visit the site to become familiar with the work performed by others prior to Bid PID- 814-010-096-01, Basement - Structural Repair structure associated with locker rooms as recommended in previous A/E report Heating - Repair / replace hot water heating piping serving natatorium and locker rooms Plumbing - Replace domestic water and sanitary waste and vent piping serving locker rooms First Floor Architectural - Redesign locker room to comply with current building codes, accessibility codes, plumbing, mechanical, electrical and swimming pool codes. Repair / replace floor, wall, and ceiling building materials as recommended in report. Replace toilet, shower, and dressing compartments, lockers, and benches. Replace toilet accessories. Interior Design - Redesign interior material finishes. Structural Repair structure associated with locker rooms as recommended in previous report Heating - Repair / replace hot water heating piping serving locker rooms - Ventilating - Replace air handling unit serving locker rooms located on Third Floor mechanical penthouse Plumbing - Replace domestic water and overhead sanitary waste and vent piping serving locker rooms Electrical - Repair / replace power and lighting serving locker rooms Second Floor Architectural - At second floor natatorium spectator seating area, replace existing chain link metal railings with glazed decorative metal railings. Exterior Architectural - At third floor mechanical penthouse, south exterior wall , repair / replace exterior face brick veneer above new natatorium roof. Add masonry flashing and weeps. Add expansion joints.

GC Bidding

$6,000,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
513
Active Projects
246
Bidding Soon
3,804
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2026

December 7, 2026

Project location map

9501 S King Dr, Chicago, IL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed