Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 14, 2026 at 8:00 PM
Updated October 4, 2026
Renovation of a municipal facility in Honolulu, Hawaii. Completed plans call for the renovation of a municipal facility.
Installation and improvement of office workstations for the Department of Taxation Oahu office. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Questions relating to this solicitation shall be submitted via HlePRO and will be answered by the Question & Answer deadline. General processing questions may be directed to Weisi Gao via email at Weisi.T.Gao@hawaii.gov. Install two (2) standard cubicle workstations by the Electrical Network and entrance hallway of Collection Door 204 area: All the panels will be typical , tackable cubicle panels. Sound-absorbing is preferred but not required. o "L" Shaped desk 30" W x 72" L with a 24" W x 54" L return. o One (1 ) panel approximately 80" H x 156" L to build left side cubicle wall near the Electrical Network. One (1) continuous panel, approximately 80" H x 42" L, extending along the left side of the cubicle wall and continuing along the adjacent wall near the electrical/network outlets. Two (2) panels approximately 65" H x 84" L located front and back, to build cubicle structure. One (1 ) dividing panel ("side panels") between workstations approximately 65" H x 84" L Two (2) end panels ("front panels") approximately 65" H x 42" L with a 15" H frosted glass stacker (total height = 65" H x 72" L). Each workstation will have one ( 1 ) overhead cabinet with locking cover at 45" L located at the return. Each workstation will have one ( 1 ) 3-drawer pedestal file cabinet under the desk. Electrical power harness and wiring to run through panels. Contractor will provide electrician to install and connect elecSection 1 Layout 1 ) Each Workstation will have one overhead cabinet with locking cover 2) Each Workstation will have one 3-drawer pedestal file cabinet under the desk2. Install three (3) standard cubicle workstations by General Storage and behind the Collection Conference Room area: o All the panels will be typical , tackable cubicle panels. Sound-absorbing is preferred but not required. o "L" Shaped desk 30" W x 72" L with a 24" W x 54" L return. o o o o o One (1 ) panel approximately 65" H x 252" L to build one side cubicle wall near the Collection Conference Room. Two (2) panels approximately 65" H x 72" L located at each end, to build cubicle structure. Two (2) dividing panels between workstations approximately 65" H x 72" L Three (3) side panels approximately 50" H x 40" L with a 15" H frosted glass stacker (total height = 65" H x 42" L). Each workstation will have one ( 1 ) overhead shelf cabinet with locking cover at 45" L located at the return . Each workstation will have one ( 1 ) 3-drawer pedestal file cabinet under the desk. Electrical power harness and wiring to run through panels. Contractor will provide electrician to install and connect electrical wiring to existing electrical power source.3. Install two (2) standard panels for Supervisor office by the General Storage area (supervisor #1 ): o All the panels will be typical , tackable cubicle panels. Sound-absorbing is preferred but not required. L. One (1 ) panel facing the General Storage (by the pillar) approximately 80" H x 90" One (1 ) panel facing the wall approximately 80" H x 90" L. Electrical power harness and wiring to run through panels. Contractor will provide electrician to install and connect electrical wiring to existing electrical power source.4. Install nine (9) standard cubicle workstations by the Storage Room next to Office Audit Room and entrance hallway of Collection Door 230 area: All the panels will be typical, tackable cubicle panels. Sound-absorbing is preferred but not required. "L" Shaped desk 30" W x 72" L with a 24" W x 54" L return. Three (3) panel approximately 65" H x 252" L to build one side cubicle wall near the Pillars. Six (6) panels approximately 65" H x 72" L located at each end, to build cubicle structure. Six (6) dividing panels between workstations approximately 65" H x 72" L Nine (9) side panels approximately 50" H x 40" L with a 15" H frosted glass stacker (total height = 65" H x 40" L). Each workstation will have one (1 ) overhead shelf cabinet with locking cover at 45" L located at the return. Each workstation will have one ( 1 ) 3-drawer pedestal file cabinet under the desk. Electrical power harness and wiring to run through panels. Contractor will provide electrician to install and connect electrical wiring to existing electrical power source5. Install six (6) standard panels for Supervisor office by the General Storage area (supervisor #2): o All the panels will be typical, tackable cubicle panels. Sound-absorbing is preferred but not required. One (1 ) panel facing the Office Audit section approximately 80" H x 132" L. One (1 ) panel facing the hallway near the new (9) cubicle workstations approximately 80" H x 204" L. Two (2) panels facing the window approximately 80" H x 60" L and 80" H x 36" L. Two (2) panels for the entrance approximately 80" H x 66" L and 80" H x 24" L. Two (2) panels for the L-shaped entrance and center support 80" H x 30"L. Two (2) overhead shelf cabinets with locking cover at 45" L by the panels facing the Office Audit section and the window. Electrical power harness and wiring to run through panels. Contractor will provide electrician to install and connect electrical wiring to existing electrical power source.
Post-Bid
$470,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 28, 2026
October 1, 2026
830 Punchbowl St, Honolulu, HI
Related To This Project
Honolulu, HI
Bid Date: Sep 25 2026
Honolulu, HI
Bid Date: Oct 27 2026
Honolulu, HI
Bid Date: Oct 08 2026
Honolulu, HI
Bid Date: Oct 02 2026
Honolulu, HI
Bid Date: Sep 18 2026
Honolulu, HI
Bid Date: Sep 23 2026
Honolulu, HI
Bid Date: Sep 14 2026
Honolulu, HI
Bid Date: Sep 23 2026
Honolulu, HI
Bid Date: Oct 02 2026
Honolulu, HI
Bid Date: Sep 10 2026
Honolulu, HI
Bid Date: Sep 28 2026
Honolulu, HI
Bid Date: Oct 16 2026
Honolulu, HI
Bid Date: Sep 10 2026
Honolulu, HI
Bid Date: Sep 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
