BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 29, 2026

Site work and new construction of a road / highway in Brighton, Colorado. Completed plans call for the construction of a road / highway.

Installation of an overhead variable message sign at the intersection of 3rd Avenue and Bridge Street, including furnishing all labor, equipment, supplies, and materials. Scope of Services The Contractor shall perform , at a minimum, the following services: Remove and properly dispose of the existing banner poles, hardware, and all associated components. Furnish and install new caissons and foundations in accordance with engineered requirements. Furnish and install new poles and mast arms designed to support the VMS units. Furnish and install two (2) new full-color LED Variable Message Signs. Refer to the attached specifications supplied by McCain, Inc. Furnish and install the new control cabinet, communications equipment, and associated hardware. Perform directional boring and install electrical service from the existing transformer to the new control cabinet. Perform directional boring and install fiber communications from the existing 4th Avenue and Bridge Street intersection to the new control cabinet. Complete system testing , integration, and commissioning of the full VMS system to ensure operability and communication functionality. Provide traffic control in full compliance with City standards and MUTCD requirements for the duration of the Work. Traffic control plan must be submitted and approved by the City prior to mobilization. Restore all disturbed areas to pre-construction condition or better, including cleanup and disposal of materials.

GC Bidding

$450,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
126
Bidding Soon
1,631
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2026

November 9, 2026

Project location map

3rd Avenue and Bridge Street, Brighton, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.