Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2026 at 8:00 PM

Updated September 29, 2026

Site work and paving for a mixed-use development in Deltona, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project consists of the construction of approximately 5,170 linear feet of 12-inch HDPE stormwater force main for the City of Deltona, Florida, along the east side of Courtland Boulevard and the south side of Belkton Court, terminating at the Belkton Court cul-de-sac. Work includes horizontal directional drilling and open-cut installation, connections to the existing stormwater system, abandonment of approximately 6,055 linear feet of existing 8-inch force main, adjustments to existing potable water mains, coordination with utility service providers for the relocation or adjustment of conflicting utilities, roadway, sidewalk, and driveway restoration, pavement milling and resurfacing, sodding, erosion control, maintenance of traffic, and all associated appurtenances necessary to complete the project. Contract time is 150 calendar days to substantial completion from issuance of the Notice to Proceed, with an additional 30 days to final completion. Total contract time for this project is 180 calendar days. A Bid Bond OF 5% of total bid is required for this solicitation. A Payment and Performance bond is required for this project. All questions are to be directed, IN WRITING, to Jacque Cioffi at jcioffi@deltonafl.gov. All questions are to be directed, IN WRITING, to Jacque Cioffi at jcioffi@deltonafl.gov.

GC Bidding

$2,071,228.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
171
Bidding Soon
2,295
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2026

December 11, 2026

Project location map

Multiple Locations, Deltona, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed