Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 15, 2026 at 8:00 PM
Updated September 21, 2026
Demolition, site work, renovation and addition to a laboratory facility in Jonesboro, Arkansas. Completed plans call for the addition of a laboratory facility; for the demolition of a laboratory facility; for the renovation of a laboratory facility; and for site work for a laboratory facility.
Arkansas State University has engaged a design team to provide New York Institute of Technology College of Osteopathic Medicine with much-needed expansion space in the existing Leadership and Education Studies Building on the Jonesboro campus. The concept of reinventing the existing mid-century modern structure rather than demolishing it for new construction continues to drive the team's pursuit. The project aims to realize with a DNA rooted in maximizing return on investment through a faster, leaner, and better design and construction process that meets inherent challenges head-on with found opportunities. The team wishes to create a state-of-the-art environment centered on heart, spirit, and mind, a place that becomes a center of learning as well as a recruitment and retention tool for medical education. The medical education program consists of 9,300 gross square feet of simulated medical education; including: exam rooms, home health, and emergency simulation spaces. Support for simulation includes multiple debrief rooms, control rooms, a standardized patient lounge, and equipment storage. Headwalls with utility ports are included as simulation only, no active medical utilities in the scope of the work. The concept of reinventing the Leadership and Education Studies Building involves editing out unnecessary constructs above the slab, valuing what remains, and adding to it with precision and intent, which is often overlooked when budgets are less humble. The goal of creating architecture engineered with precision and thoughtfulness is to provide academia with livability and accommodation, which are frequently found in the hospitality industry but are lacking in a college setting. The entire team has high expectations of delivering this 37,000 square foot reinvention with equal to or better than new construction project. The anticipated construction will begin in April of 2027, and completed by July 2028.
GC Bidding
$20,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2026
April 1, 2027
2713 Pawnee Street, Jonesboro, AR
Related To This Project
Jonesboro, AR
Bid Date: Oct 01 2026
Jonesboro, AR
Bid Date: Oct 01 2026
Jonesboro, AR
Bid Date: Sep 16 2026
Jonesboro, AR
--
Jonesboro, AR
--
Jonesboro, AR
Bid Date: Sep 03 2026
Jonesboro, AR
Bid Date: Sep 08 2026
Jonesboro, AR
Bid Date: Aug 19 2026
Jonesboro, AR
--
Jonesboro, AR
Bid Date: Aug 14 2026
Jonesboro, AR
Bid Date: Aug 06 2026
Jonesboro, AR
--
Jonesboro, AR
--
Jonesboro, AR
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
