Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 30, 2026 at 8:00 PM

Updated November 8, 2026

Renovation of a fire / police facility in Fremont, California. Completed plans call for the renovation of a fire / police facility.

Fire Station 4 - Demolition and removal of existing gas fired furnaces and rooftop condensing units; provide direct replacements of furnaces and condensing units with all electric heat pump fan coil and condensing units; provide integration of new HVAC equipment into existing building Allerton controls system; provide integration of new electrical power from existing panels for new HVAC equipment; provide Fan Coil 'FC-4" located on lower level and all other scope as indicated in plans, specs, and bid documents. City to provide Commissioning Agent. Fire Station 5: Demolition and removal of existing gas fired furnaces and rooftop condensing units; provide direct replacements of furnaces and condensing units with all electric heat pump fan coil and condensing units; integration of new HVAC equipment into existing building Allerton Controls system; install new electrical power from existing panels for new HVAC equipment and all other scope as indicated in plans, specs, and bid documents. City to provide Commissioning Agent. Question Deadline 11/23/2026 at 2:00 PM PT Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Gurshran (Gigi) Gill , Facilities Design & Construction Project Supervisor I, at GGill@fremont.gov. Oral responses are not authorized and are not binding on the City. Bidders should submit any such written inquiries by 2 p.m. at least 6 Working Days before the scheduled bid opening. The Project is located at two sites, Fire Station 4 is located at 1000 Pine Street, Fire Station 5 is located at 55 Hackamore Lane. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after City issues the Notice of Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, and any other submittals required by the Contract Documents and as specified in the Notice of Award. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. If Contractor fails to complete the Work within the Contract Time, City will assess liquidated damages in the amount of $2,000 for each day of unexcused delay in achieving Final Completion, and the Contract Price will be reduced accordingly. This Project requires a valid California contractor's license for the following classification(s): C-20 - Warm-Air Heating, Ventilating and AirConditioning Contractor. Contractors bidding as a joint venture must secure a joint venture license prior to award of the Contract for the Project. The estimated construction cost, or construction cost range, for the Project is $480,000. From the Commencement Date set forth in the Notice to Proceed, the Project must be fully completed within 60 Working Days (the "Contract Time"). If you have any questions relating to delivery, please email letran@fremont.gov.

Sub-Bidding

$480,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
225
Bidding Soon
3,495
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2026

December 31, 2026

Project location map

Multiple Locations, Fremont, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed