BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 19, 2026 at 8:00 PM

Updated September 25, 2026

Site work and renovation of a medical facility in Madison, Wisconsin. Completed plans call for the renovation of a medical facility; and for site work for a medical facility.

Installation of fiber optic cable, fiber drawers, and LC terminations to support paging system upgrade. Work includes underground fiber connection installation to multiple buildings, use of existing trenches, and cable testing Provide, install, and test a dedicated, independent, underground fiber connection consisting of a 6-strand indoor/outdoor armored plenum single-mode (OS2) fiber optic cable, accessories, and installation to Bldgs. 4 and 12, a dedicated, independent, underground fiber connection consisting of a 6-strand indoor/outdoor plenum single-mode (OS2) fiber optic cable, accessories , and installation to Bldgs. 2, 5, 6, and 7 (materials except for SMURF Tubes furnished by the government (GFE)), and a dedicated, independent fiber connection consisting of a 18 or 24-strand indoor armored plenum single-mode (OS2) fiber optic cable(s), accessories , and installation from C-Wing Core (Rm . C- 125) to the Penthouse. Fiber will be run using existing trenches/pathways (including those used by Federal Electronic Health Record (FEHR) and other fiber, where possible). Includes 1U fiber drawers and LC terminations (as needed), and project management. Contractor will use SMURF Tube to protect GFE provided non-armored fiber inside buildings. Fiber should terminate in the same room as the paging/network equipment in each building. Demark terminating at Bldg. 1 is C125 patch panel, run fiber optic above ceiling tiles in C125. Patch panels must be properly labeled. Government furnished equipment (GFE) for Bldgs . 2, 5 , 6, and 7 includes: 6-Strand Indoor/Outdoor Plenum Single Mode, 11000 FT Berk-Tek LTP006AB0403 lu Fiber Panel, 7 EA Belden AX104681-TA 6-Port LC Single Mode Adapter Panel, 6 EA Belden FFSX06LD 12-Port LC Single Mode Adapter Panel , 3 EA Belden FFSX12LD 12-Strand Splice Trays, 9 EA Corning M67-048 1M LC Single Mode LC Pigtails, 80 EA Netsource NP900SM-LC-1M 40mm Heat Shrink Sleeves, 2 PK Corning 2806032-01 All quotations shall be sent to the GLAC to Contracting Officer Parris Weidenbach at parris.weidenbach@va.gov. Submission shall be received no later than September 16, 2026, by 12:00 P.M. Central Time.

Post-Bid

$650,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
93
Bidding Soon
1,961
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2026

October 19, 2026

Project location map

Multiple Locations, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.