BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2026 at 8:00 PM

Updated September 26, 2026

Site work and renovation of a detention facility in Willow River, Minnesota. Completed plans call for the renovation of a detention facility; and for site work for a detention facility.

General contracting work of similar scope for building renovation and site improvements at Minnesota Correctional Facility. The Project consists of the construction of renovation of the Administration Building. Briefly and without force and effect upon the Contract Documents, the Work of this single prime Contract can be summarized as follows: 2 Work under this Contract includes: Sitework: Rough and finish grading, paving, ground cover. Security gate, signage, parking lot extension, striping, and miscellaneous site improvements. Building Structure: 1) Steel bar joist/deck. Building Enclosure: Exterior wall systems of face brick, cavity wall insulation, stucco , EIFS, metal panels, prepainted metal siding. Roof patching Interior Finishes: Insulated gypsum board/metal stud partitions, concrete block. Floor finishes of carpet, resilient sheet goods, ceramic tile, porcelain tile. Wall finishes of paint, vinyl wallcovering, wall fabric over tackable panels, brick, ceramic tile, porcelain tile, plaster. Ceiling finishes of acoustical lay-in tile, gypsum board, gypsum board soffits. 5) Plastic laminate casework, HM doors and frames, wood doors, detention doors and frames, access panels, hardware, detention hardware, glazing, lockers, food service equipment, toilet accessories, signage, detention equipment, miscellaneous specialties. Mechanical Systems: Plumbing including, supply and waste piping systems, piping insulation, plumbing fixtures. Heating including piping, piping insulation. Ventilation to include, air handlers, unit ventilators, fan coils, ductwork, duct insulation, chilled water piping. 4) Temperature control system. Electrical Systems: 1) Electrical distribution panels, conduit and wiring. 2) Interior and exterior lighting. Parking lot lighting. 3) Low voltage work to include: structured cabling, access control. 4) Fire alarm . Questions regarding attendance, pre- registration, or access requirements shall be directed to Renee Peterson at Renee.Peterson@state.mn.us. Question Deadline 10/01/2026 at 2:00 PM CT All questions should be submitted Soliciting Agent: Mandy Flum. Department of Administration. mandy.flum@state.mn.us The work will be done under one prime contract that includes: General , Mechanical, Demolition, Excavation, Civil, and Electrical construction. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1 . Phased renovations to the occupied Administration Building at MCF-Willow River to improve security, accessibility, and staff and visitor functions Work includes interior demolition and construction; modifications to the entrance, reception and service areas, search rooms, master control , offices, visitation and support spaces; accessible toilet-room improvements; doors, frames, hardware, casework, and finishes; and associated structural , plumbing, mechanical, electrical, technology, access-control, and video-surveillance work. Exterior improvements include accessible parking and routes, paving and striping, site lighting, security gates and devices, signage, and related site work.

GC Bidding

$1,991,465.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
16
Bidding Soon
463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2026

April 1, 2027

Project location map

86032 Co Hwy 61, Willow River, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.