Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 1, 2026 at 8:00 PM

Updated October 7, 2026

Renovation of a municipal facility in Toronto, Ontario. Completed plans call for the renovation of a municipal facility.

The project generally consists of the replacement and renewal of the existing rooftop HVAC systems at York Civic Centre. The work includes the removal of two existing make-up air units (MAU-1 and MAU-2) and six existing air handling units (AHU-1 through AHU-6), and their replacement with new high-efficiency heat pump equipment complete with auxiliary heating, controls, and associated systems. Documents are available at https://portal.us.bn.cloud.ariba.com/dashboard The Question Period closes on October 1, 2026 as per Adda 3

Sub-Bidding

$300,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
576
Active Projects
267
Bidding Soon
4,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2026

November 5, 2026

Project location map

2700 Eglinton Ave W, Toronto, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed