BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 18, 2026 at 8:00 PM

Updated September 23, 2026

Site work and new construction of a military facility in Edwards AFB, California. Completed plans call for the construction of a military facility; and for site work for a military facility.

Acquisition of a JSF Flight Equipment Trailer. SCOPE 2.1 The 412th Maintenance Group, Edwards AFB, CA, requests a proposal for the construction, delivery and installation of an approximately 36'x60' modular RLF immediately east of 1819C, at Edwards AFB, CA. 2.2 Contractor shall perform site preparation, erect safety barricades, site clean-up, and demobilization of facilities and sites as required in this SOW. 2.3 The contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this SOW. DESCRIPTION OF WORK 3.1 Contractor shall perform all services required to complete investigations and specifications related to this SOW. The contractor shall adhere to UFC 3-301-01, UFC 3-310-04, MIL STD 3007, and all other Federal Aviation Administration (FAA) specifications, Military Specifications , Unified Facilities Criteria (UFC), Air Force Instructions (AFI), Edwards Air Force Base Standards, applicable laws, regulations, and standards that encompass this project. Contract personnel shall be escorted, by 461st FLTS F-35 Site Support personnel, while operating on the flightline and adhere to all rules and regulations of driving and working on the flightline. To meet the contract requirements, the Contractor shall prepare and furnish drawings, as required for the accomplishment of the project scope in accordance with the requirements of this SOW. The Contractor shall provide all drawings, complete details, warranty information, material samples , product data from manufacturer/suppliers, standard color charts/catalogues for proposed materials and finishes as applicable and the proposed work schedule for Air Force review and approval prior to commencement of any work. All contract drawings shall be well prepared, complete, and accomplished in accordance with the best professional practice to show clearly and concisely the type of work to be performed. All drawings shall be provided to the Government customer, Joshua Beaumont, for review. 3.1.2 The contractor shall provide all tools, material , and equipment necessary for contract performance. Government Furnished Property (GFP) is not being used/contemplated on this effort. Primary Point of Contact: Abel Alcantar Contracting Specialist abel.alcantar.1@us.af.mil Secondary Point of Contact: Falilou Diouck Contract Officer falilou.diouck@us.af.mil, Phone inquiries are not available currently. All questions and answers will be posted to this RFQ. Question Deadline 09/18/2026 at 5:00 PM PT

Post-Bid

$1,800,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
498
Active Projects
218
Bidding Soon
3,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2026

December 21, 2026

Project location map

225 N. Flightline Rd, Edwards AFB, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.