Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 6, 2026 at 8:00 PM

Updated October 8, 2026

Site work and renovation of a water / sewer project in Fremont, Nebraska. Completed plans call for the renovation of a water / sewer project.

Lead and galvanized water service line replacements including property coordination, excavation, plumbing, electrical grounding, traffic coordination, and surface and site restoration. The Work generally consists of lead and galvanized water service line replacements at approximately 150 properties within the City of Fremont during the initial Contract period through June 30, 2028. The Contract may be renewed by amendment for additional one-year periods, during which Owner may assign additional properties, up to a maximum aggregate total of approximately 634 properties under the initial Contract and all renewals. Work includes property coordination, excavation, plumbing, service-line replacement, electrical grounding, traffic coordination, surface and site restoration, required documentation, and related work. The Work will require use of an Owner provided in-the-field documentation system and itemized invoices. Quantities are estimates and are not guaranteed. Owner reserves the right to award the Work to up to two Contractors and to allocate the property worklist between those Contractors as Owner determines necessary to complete the replacements within the Contract period. Poject location Various locations throughout the City of Fremont, Nebraska. Question Deadline 10/01/2026 Question submitted to : Ethan Hall (402) 435-3080 ehall@jeo.com Performance and Payment Bonds will each be required at 75% of the initial Contract Price as indicated in SC-6.01.

GC Bidding

$1,100,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
79
Bidding Soon
894
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

December 7, 2026

Project location map

Multiple Locations, Fremont, NE

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed