Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 23, 2026 at 8:00 PM
Updated October 5, 2026
Site work for an educational facility in Fort McMurray, Alberta. Completed plans call for site work for a 6,943-square-foot, one-story above grade educational facility.
The proposed addition is located at 230 Powder Drive, Fort McMurray, Alberta within SW 36-89-10-W4M. An existing school was present at the site and proposed expansion area is located on the existing landscaped area located north of Holy Trinity School, as shown on Figure 1 - Location Plan. Access to site is via Parsons Creek Drive bordering the north side of the subject property. At the time of reporting it was unknown what type of existing foundation type the existing school was constructed on. At the time of the field investigation, the site was gently sloping, down to south surfaced with grass, and bordered by a parking lot to the east, a football field to the west, and the school building to the south. An aerial photograph of the site and surrounding area is presented on Figure 2 - Area Plan. Site photographs are provided in the Figures Appendix. To construct a connecting link and install four modular unit classrooms to the existing core school with site modifications to suit this new addition.
Post-Bid
$1,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2026
November 1, 2026
230 Powder Dr, Fort McMurray, AB
Related To This Project
Fort McMurray, AB
Bid Date: Oct 07 2026
Fort McMurray, AB
Bid Date: Sep 30 2026
Fort McMurray, AB
Bid Date: Oct 02 2026
Fort McMurray, AB
Bid Date: Oct 07 2026
Fort McMurray, AB
Bid Date: Oct 07 2026
Fort McMurray, AB
Bid Date: Oct 20 2026
Fort McMurray, AB
Bid Date: Oct 02 2026
Fort McMurray, AB
Bid Date: Oct 06 2026
Fort McMurray, AB
Bid Date: Oct 06 2026
Fort McMurray, AB
Bid Date: Sep 25 2026
Fort McMurray, AB
Bid Date: Sep 18 2026
Fort McMurray, AB
Bid Date: Sep 09 2026
Fort McMurray, AB
Bid Date: Sep 11 2026
Fort McMurray, AB
Bid Date: Aug 28 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed