Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 7, 2026

Demolition, site work, new construction and addition to a medical facility in Lexington, Kentucky. Completed plans call for the addition of a medical facility; for the construction of a 2,080,000-square-foot medical facility; and for the demolition of a medical facility.

the of expansion the on focus the with - facility bed SF million a of construction the involve will project The services support clinical and beds inpatient additional accommodate will building The project Facility Care Patient Expand observation rooms inpatient pediatric and adult to limited not are but include location this for targeted services General administration lab retail pharmacy services imaging services diagnostic procedures minor rooms operating spaces spaces meeting and support Walsh III JV Turner Walsh Manager Construction and University Owner Kentucky of University The packages below the for P RFQ Proposals and Qualifications for Request soliciting is WTJV or JV Turner more or one with A KRS by authorized as CN Negotiation Competitive into enter to intent the with subcontractors Preconstruction Assistance Preconstruction provide shall Subcontractor Negotiation Competitive he most a in provided be to are services These project the for services Close-out and Turnover Construction The etc modularization prefabrication BIM methodology construction lean utilizing manner efficient award for considered be will project the to value best the be to determined subcontractor execution planning implementation BIM to limited not but including work Assistance Preconstruction All value analysis systems reviews constructability and design approaches construction lean developing cost detailed development budget planning procurement material planning prefabrication management site projections manpower and flow cash submittals early development schedule projections estimates to prior focused be will this of majority a While criteria commissioning and studies special logistics change any with construction during applied be will principles same these that expected is it construction Development Design of combination a from developed be will GMP final The submission GMP Final work of quarter first the during issued be to planned are which documents Construction and documents basis quarterly a on reports backlog company updated submit shall s firm Negotiation Competitive The engagement after awarded are projects new any when JV Turner Walsh to notification provide and minimum Project Facility Care Patient Expand Care Health Kentucky of University the in project the of completion to prior point any at agreement the terminate to right the reserves JV Turner Walsh to non-responsive be schedule project maintain to fail budget project maintain to fail subcontractor the should Walsh by authorized work actual for paid be will subcontractor the termination Upon etc team project the but including work Construction All date termination the to up subcontractor the by performed and JV Turner installation meetings progress routine in participation coordination onsite scheduling lean to limited not projections and control cost administration construction administration safety testing startup QC QA to services maintaining while components system of construction for methods and means determining operations Owner adjacent question deadline date changed from 10/02/2026 to 10/06/2026 as per Addendum 2

GC Bidding

$2,000,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
75
Bidding Soon
2,009
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2026

December 14, 2026

Project location map

328 Old Vine St, Lexington, KY


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed