Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 25, 2026 at 8:00 PM
Updated September 28, 2026
Demolition, site work, new construction and addition to a medical facility in Lexington, Kentucky. Completed plans call for the addition of a medical facility; for the construction of a 2,080,000-square-foot medical facility; and for the demolition of a medical facility.
the of expansion the on focus the with - facility bed SF million a of construction the involve will project The services support clinical and beds inpatient additional accommodate will building The project Facility Care Patient Expand observation rooms inpatient pediatric and adult to limited not are but include location this for targeted services General administration lab retail pharmacy services imaging services diagnostic procedures minor rooms operating spaces spaces meeting and support Walsh III JV Turner Walsh Manager Construction and University Owner Kentucky of University The packages below the for P RFQ Proposals and Qualifications for Request soliciting is WTJV or JV Turner more or one with A KRS by authorized as CN Negotiation Competitive into enter to intent the with subcontractors Preconstruction Assistance Preconstruction provide shall Subcontractor Negotiation Competitive he most a in provided be to are services These project the for services Close-out and Turnover Construction The etc modularization prefabrication BIM methodology construction lean utilizing manner efficient award for considered be will project the to value best the be to determined subcontractor execution planning implementation BIM to limited not but including work Assistance Preconstruction All value analysis systems reviews constructability and design approaches construction lean developing cost detailed development budget planning procurement material planning prefabrication management site projections manpower and flow cash submittals early development schedule projections estimates to prior focused be will this of majority a While criteria commissioning and studies special logistics change any with construction during applied be will principles same these that expected is it construction Development Design of combination a from developed be will GMP final The submission GMP Final work of quarter first the during issued be to planned are which documents Construction and documents basis quarterly a on reports backlog company updated submit shall s firm Negotiation Competitive The engagement after awarded are projects new any when JV Turner Walsh to notification provide and minimum Project Facility Care Patient Expand Care Health Kentucky of University the in project the of completion to prior point any at agreement the terminate to right the reserves JV Turner Walsh to non-responsive be schedule project maintain to fail budget project maintain to fail subcontractor the should Walsh by authorized work actual for paid be will subcontractor the termination Upon etc team project the but including work Construction All date termination the to up subcontractor the by performed and JV Turner installation meetings progress routine in participation coordination onsite scheduling lean to limited not projections and control cost administration construction administration safety testing startup QC QA to services maintaining while components system of construction for methods and means determining operations Owner adjacent Question Deadline 10/02/2026 at 3:00 PM ET All pre-proposal requests for information (RFIs), or other communication must be in written format and should be submitted to: UKChandlerWTJV@walshgroup.com
GC Bidding
$2,000,000,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2026
December 14, 2026
328 Old Vine St, Lexington, KY
Related To This Project
Lexington, KY
Bid Date: Sep 16 2026
Lexington, KY
Bid Date: Sep 29 2026
Lexington, KY
Bid Date: Oct 09 2026
Lexington, KY
Bid Date: Oct 13 2026
Lexington, KY
--
Lexington, KY
--
Lexington, KY
--
Lexington, KY
Bid Date: Oct 15 2026
Lexington, KY
Bid Date: Oct 06 2026
Lexington, KY
Bid Date: Oct 07 2026
Lexington, KY
--
Lexington, KY
Bid Date: Sep 30 2026
Lexington, KY
--
Lexington, KY
Bid Date: Sep 24 2026
Lexington, KY
Bid Date: Sep 21 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
