Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 23, 2026 at 8:00 PM
Updated September 26, 2026
Renovation of a municipal facility in Juneau, Wisconsin. Completed plans call for the renovation of a municipal facility.
Update HVAC Controls Replacement of existing HVAC Control system to Carrier i-VU BACNET Controls (or similar). Also to install all new Carrier BACnet Controls (or similar) and Sensors to be compatible with a new Carrier i-VU (or similar) front end. Part 1: AHU-1, Boiler Plant, and VAV Zones AHU -1 Demo Existing Controls for AHU-1 Furnish and Install New Discharge Air, Return Air Temp Sensor. Add new Controller for Existing AHU-1. Pull new Communications Bus from Closest VAV to AHU-1. Program New AHU-1 Controller. Remove Existing Touch Screen Controller Start-Up and Sequencing of New AHU Controller. Provide AHU-1 Graphics to Front End . AHU-1 VAV Zone Controllers Demo Existing VAV Zone Controllers. Pull New Communication Network to New VAV Controller. Pull New 18/4 Zone Temp Sensor Cable to Each VAV Zone Stat. o Demo Existing T-55 Zone Sensors. Install (8) Carrier ZS2PL (or similar) Zone Sensors. Install (8) Discharge Air Temp Sensors. Install (8) Carrier i-VU BACnet (or similar) Zone Controllers. Remove (8) Floating Point Hot Water Actuators. Install (8) New Honeywell (or similar) 2-10 VDC VAV Hot Water Actuators. Re-Program and Commission Finned Tube Valves to Function in Similar Fashion to Other Branches. o Start-up and Commissioning of New Zone Controllers. Boiler Plant and Devices Controls- o Remove Existing CCN Control Board. o Furnish and Install new Carrier Controller for Boiler Controls. o Pull BACnet Communication wires to Boiler Room for New Controller. Program Boiler Loop Pumps for Weekly Rotation. Start/Stop Relay to Each Boiler Loop Pump. Status Relay to Each Boiler Pump for Monitoring, Rotation, and Alarming. Start/Stop Relay to Each Boiler. Boiler Status/Alarm Relay to Each Boiler for Monitoring, Rotation, and Alarming. o Program and Sequencing of Boilers and Boiler Loop Pumps. o Provide Graphics for Boiler Plant and Pumps and add to i-VU Front End. Add Boiler Room Space Temp to Graphics Part 2: Truck Storage Building and Office Truck Storage Building and Office RTU -1 o Demo Existing Controls for RTU-1 Add new Controller for Existing RTU- 1 . Furnish and Install New Discharge Air, Return Air Temp Sensor. Pull new Communications Bus from Closest Controller to RTU-1. Program New RTU-1 Controller. Remove Existing Touch Screen Controller o Start-Up and Sequencing of New AHU Controller. o Provide RTU-1 Graphics to Front End. Truck Storage Building and Office MAU/GAS 1,2 o Demo Existing Controls for MAU Furnish and Install New Discharge Air, Return Air Temp Sensor. Add New Controller for Existing MAU-1. Pull new Communications Bus from Closest Controller to MAU-1. Program New MAU-1 Controller. o Start-Up and Sequencing of New MAU-1 Controller. o Provide MAU-1 Graphics to Front End. o Provide Controller for CO/NO2-1 o Program Controller to Monitor CO/NO2-1 Program Controller to Open Louver 2 and 3 o Program Controller for EF-8 Enable Program Controller for Stage1&2 Lighting o Graphics and Front End Integration for All Sequences Truck Storage Building and Office GAS 3,4/Combustible Gas 5 Demo Existing Controls for GAS 3,4,5 Add New Controller for Existing CO/NO2 3 Add New Controller for Existing CO/NO2 4 Add New Controller for Existing Combustible Gas 5 Pull new Communications Bus from Closest Controller to CO/NO2 3,4,5 Program Controller to Monitor Washy Bay 1 Pumps Status Program Controller for EF -1 Enable Program Controller for EF-3 Enable o Program Controller for EF-5 Enable Program Controller for EF-7 Enable o Program Controller for EF- 10 Enable o Program Controller for EF-11 Enable . Graphics and Front End Integration for All Sequences Truck Storage Building and Office GAS 5,6,11 Demo Existing Controls for GAS 3,4,5 Add New Controller for Existing CO/NO2 5 dd New Controller for Existing CO/NO2 6 Add New Controller for Existing CO/NO2 11 Pull new Communications Bus from Closest Controller to CO/NO2 5,6,11 Graphics and Front End Integration for All Sequences Truck Storage Building and Office GAS 7,8 . Demo Existing Controls for GAS 7,8 Add New Controller for Existing CO/NO2 7 Add New Controller for Existing CO/NO2 8 Pull new Communications Bus from Closest Controller to CO/NO2 7,8. Program Controller to Monitor Washy Bay 1 Pumps Status Program Controller for EF-4 Enable Graphics and Front End Integration for All Sequences Truck Storage Building and Office GAS 9,10 Demo Existing Controls for GAS 9,10 Add New Controller for Existing CO/NO2 9 Add New Controller for Existing CO/NO2 10 Pull new Communications Bus from Closest Controller to CO/NO2 9,10. Program Controller to Monitor Washy Bay 2 Pumps Status Program Controller for EF-6 Enable Graphics and Front End Integration for All Sequences Part 3 - Carrier iVU Front End Carrier i-VU Pro Furnish and Install Carrier i-VU Pro Software Install Software on Owner Provided Windows 10 PC. License i-VU Configured per Owners Preference. i-VU License has No Expiration or Annual Fees. Provide and Install New Carrier XT-RB Router Use Graphics and Tables Saved to Rebuild/Reinstall Floorplans Make Graphic Changes per Owner Request for Preferred System Navigation Owner's Training on New System 1 Year Parts and Labor Warranty Part 4 - Controls System Components Warranty o One year parts and labor warranty Manufactures warranty Question Deadline 09/29/2026 at 10:00 AM CT All questions related to this RFB must be in writing and received by the County Purchasing Office at least five (5) business days prior to the bid due date. Questions shall be directed to the Purchasing Agent via email to: tsteinbach@co.dodge.wi.us Questions MUST be clearly marked in the subject line: Questions for RFB # 30 2026-06
Sub-Bidding
$470,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 5, 2026
November 4, 2026
211 E Center St, Juneau, WI
Related To This Project
Juneau, WI
Bid Date: Sep 08 2026
Juneau, WI
Bid Date: Jul 21 2026
Juneau, WI
--
Juneau, WI
Bid Date: Sep 03 2026
Juneau, WI
Bid Date: May 14 2026
Juneau, WI
Bid Date: Mar 24 2026
Juneau, WI
Bid Date: Apr 07 2026
Juneau, WI
Bid Date: Mar 11 2026
Juneau, WI
Bid Date: Feb 24 2026
Juneau, WI
Bid Date: Dec 23 2025
Juneau, WI
Bid Date: Dec 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
