BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 20, 2026 at 8:00 PM

Updated September 26, 2026

Renovation of a municipal facility in Peoria, Illinois. Completed plans call for the renovation of a municipal facility.

Reference Number 0000437470 This project is a Public Works Project and will be subject to Prevailing Wage Act. Please see "General Instructions to Bidders" for details. In addition to the Prevailing Wage Act requirements, Peoria County requires any General, or Sub-Contractor for contracts of $30,000 or greater, to participate in an Apprenticeship Training Program and to submit a "Certificate of Apprenticeship and Training" with bid response. General Contractors will be required to submit names of any/all subcontractors to be used on this project. Additionally, all vendors providing services for construction work on the public works project must enter into Peoria County's Community Workforce Agreement with the affiliates of the West Central Illinois Building and Construction Trades Council and Peoria County, solely for construction and demolition work on this specific project, per Chapter 6.5-34 through 6.5-36 of the Peoria County Code of Ordinances. The Community Workforce Agreement template is included in the bid specifications for review. This section provides a guideline of the Scope of Work to be included with each bid package. This section includes scope and instructions which may not be specifically called out elsewhere in the Project Manual, Plans or Specifications. All bidders should read this section carefully in its entirety. This section is not all inclusive and is to be read in conjunction with the entire set of project documents. It is each Subcontractor's responsibility to submit a complete bid. B. Subcontractors may submit a bid on more than one bid package but a separate signed bid form in a separate envelope is required for each bid package submitted. C. Where items are noted to be "provide(d)" or "include(s)" that shall indicate furnish, install, unloading, shake-out, hoisting, fasteners, incidentals, and all work necessary for a complete system. D. This specification shall have precedence for assignment of Scope of Work prior to and above any assignments of Scope of Work in the Drawings, Specifications, or elsewhere in the Contract Documents. E. Refer to part 1.4 of this specification for Work by Owner/CM/NIC/future work 1.2 BID PACKAGES List of Bid Packages: 1. Bid Package 01 - Steel 2. Bid Package 02 - Glazing 3. Bid Package 03 - HVAC 4. Bid Package 04 - Electrical Question Deadline 10/06/2026 at 1:00 PM CT Questions are submitted online No

GC Bidding

$300,000.00

Public - County

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
56
Bidding Soon
1,155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2026

November 12, 2026

Project location map

324 Main St, Peoria, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.