Published November 9, 2026 at 7:00 PM

Updated November 18, 2026

Site work, paving and renovation of a water / sewer project in Richardson, Texas. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; and for paving for a water / sewer project.

**As of November 9th, 2026, the project was awarded to SYB Construction Co., Inc with an awarded amount of $2,705,700.80** Construction of approximately 4,496 LF of 8-inch and 12-inch water mains, installation of associated water system appurtenances, pavement and concrete restoration, and asphalt milling and overlay. Question Deadline 10/13/2026 at 12:00 PM CT Deadline to submit Questions electronically The Project consists of improvements at three separate locations: Belaire Drive from North Cottonwood Drive to Cloverdale Drive _ Bishop Avenue from Jackson Street to Rayflex Drive _ _ St. Lukes Drive from West Belt Line Road to Holly Drive The work generally includes the construction of approximately 4,496 LF of 8-inch and 12-inch water mains, installation of associated water system appurtenances, pavement and concrete restoration, and asphalt milling and overlay Belaire Drive: 1. Installation of approximately 1,160 linear feet of 8-inch PVC water main by open-cut construction , including fire hydrants, water meters, HDPE water service lines, valves, and related water system appurtenances. 2. Plugging and abandonment of the existing 6-inch water main. 3. Removal and replacement of approximately 15 linear feet of concrete curb and gutter. 4. Removal and replacement of concrete roadway pavement. 5. Restoration of disturbed areas within the public right-of-way, including landscaping, sod, residential irrigation systems, and other miscellaneous items. 6. Implementation of traffic control in accordance with the Texas Manual on Uniform Traffic Control Devices (TMUTCD) and the traffic control details shown in the Contract Documents. 7. Implementation and maintenance of the Stormwater Pollution Prevention Plan (SWPPP). 8. Daily street sweeping and project site cleanup. Bishop Avenue: 1. Installation of approximately 1,330 linear feet of 12-inch PVC water main by open-cut construction, including fire hydrants, water meters, HDPE water service lines, valves, and related water system appurtenances. 2. Plugging and abandonment of the existing 10-inch water main. 3. Removal and replacement of approximately 55 linear feet of concrete curb and gutter. 4. Removal and replacement of concrete driveways, sidewalks, and roadway pavement. 5. Restoration of disturbed areas within the public right-of-way, including landscaping, sod, residential irrigation systems, and other miscellaneous items. 6. Implementation of traffic control in accordance with the Texas Manual on Uniform Traffic Control Devices (TMUTCD) and the traffic control details shown in the Contract Documents. 7. Implementation and maintenance of the Stormwater Pollution Prevention Plan (SWPPP). 8. Daily street sweeping and project site cleanup. St. Lukes Drive 1. Installation of approximately 1,881 linear feet of 8-inch PVC water main by open-cut construction, including fire hydrants, water meters, HDPE water service lines, valves, and related water system appurtenances. 2. Installation of approximately 125 linear feet of 8-inch PVC water main by trenchless construction. 3. Field modification of, and connection to, an existing 20-inch x 6-inch ductile iron cross on an existing 20-inch RCCP water line. 4. Plugging and abandonment of the existing 6-inch water main. 5. Removal and replacement of approximately 1,519 linear feet of concrete curb and gutter. 6. Removal and replacement of concrete and asphalt driveways and roadway pavement. 7. Milling and overlay of approximately 1,900 linear feet of asphalt roadway. 8. Restoration of disturbed areas within the public right-of-way, including landscaping, sod , residential irrigation systems, and other miscellaneous items. 9. Implementation of traffic control in accordance with the Texas Manual on Uniform Traffic Control Devices (TMUTCD) and the traffic control details shown in the Contract Documents. 10. Implementation and maintenance of the Stormwater Pollution Prevention Plan (SWPPP). 11. Daily street sweeping and project site cleanup

Award

$2,705,701.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
143
Bidding Soon
4,653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2026

December 21, 2026

Project location map

Multiple Locations, Richardson, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed