Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 9, 2026 at 7:00 PM
Updated November 18, 2026
Site work, paving and renovation of a water / sewer project in Richardson, Texas. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; and for paving for a water / sewer project.
**As of November 9th, 2026, the project was awarded to SYB Construction Co., Inc with an awarded amount of $2,705,700.80** Construction of approximately 4,496 LF of 8-inch and 12-inch water mains, installation of associated water system appurtenances, pavement and concrete restoration, and asphalt milling and overlay. Question Deadline 10/13/2026 at 12:00 PM CT Deadline to submit Questions electronically The Project consists of improvements at three separate locations: Belaire Drive from North Cottonwood Drive to Cloverdale Drive _ Bishop Avenue from Jackson Street to Rayflex Drive _ _ St. Lukes Drive from West Belt Line Road to Holly Drive The work generally includes the construction of approximately 4,496 LF of 8-inch and 12-inch water mains, installation of associated water system appurtenances, pavement and concrete restoration, and asphalt milling and overlay Belaire Drive: 1. Installation of approximately 1,160 linear feet of 8-inch PVC water main by open-cut construction , including fire hydrants, water meters, HDPE water service lines, valves, and related water system appurtenances. 2. Plugging and abandonment of the existing 6-inch water main. 3. Removal and replacement of approximately 15 linear feet of concrete curb and gutter. 4. Removal and replacement of concrete roadway pavement. 5. Restoration of disturbed areas within the public right-of-way, including landscaping, sod, residential irrigation systems, and other miscellaneous items. 6. Implementation of traffic control in accordance with the Texas Manual on Uniform Traffic Control Devices (TMUTCD) and the traffic control details shown in the Contract Documents. 7. Implementation and maintenance of the Stormwater Pollution Prevention Plan (SWPPP). 8. Daily street sweeping and project site cleanup. Bishop Avenue: 1. Installation of approximately 1,330 linear feet of 12-inch PVC water main by open-cut construction, including fire hydrants, water meters, HDPE water service lines, valves, and related water system appurtenances. 2. Plugging and abandonment of the existing 10-inch water main. 3. Removal and replacement of approximately 55 linear feet of concrete curb and gutter. 4. Removal and replacement of concrete driveways, sidewalks, and roadway pavement. 5. Restoration of disturbed areas within the public right-of-way, including landscaping, sod, residential irrigation systems, and other miscellaneous items. 6. Implementation of traffic control in accordance with the Texas Manual on Uniform Traffic Control Devices (TMUTCD) and the traffic control details shown in the Contract Documents. 7. Implementation and maintenance of the Stormwater Pollution Prevention Plan (SWPPP). 8. Daily street sweeping and project site cleanup. St. Lukes Drive 1. Installation of approximately 1,881 linear feet of 8-inch PVC water main by open-cut construction, including fire hydrants, water meters, HDPE water service lines, valves, and related water system appurtenances. 2. Installation of approximately 125 linear feet of 8-inch PVC water main by trenchless construction. 3. Field modification of, and connection to, an existing 20-inch x 6-inch ductile iron cross on an existing 20-inch RCCP water line. 4. Plugging and abandonment of the existing 6-inch water main. 5. Removal and replacement of approximately 1,519 linear feet of concrete curb and gutter. 6. Removal and replacement of concrete and asphalt driveways and roadway pavement. 7. Milling and overlay of approximately 1,900 linear feet of asphalt roadway. 8. Restoration of disturbed areas within the public right-of-way, including landscaping, sod , residential irrigation systems, and other miscellaneous items. 9. Implementation of traffic control in accordance with the Texas Manual on Uniform Traffic Control Devices (TMUTCD) and the traffic control details shown in the Contract Documents. 10. Implementation and maintenance of the Stormwater Pollution Prevention Plan (SWPPP). 11. Daily street sweeping and project site cleanup
Award
$2,705,701.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2026
December 21, 2026
Multiple Locations, Richardson, TX
Related To This Project
Richardson, TX
--
Richardson, TX
Bid Date: Oct 27 2026
Richardson, TX
--
Richardson, TX
--
Richardson, TX
--
Richardson, TX
--
Richardson, TX
--
Richardson, TX
Bid Date: Dec 03 2026
Richardson, TX
Bid Date: Oct 16 2026
Richardson, TX
--
Richardson, TX
Bid Date: Oct 06 2026
Richardson, TX
--
Richardson, TX
--
Richardson, TX
Bid Date: Sep 14 2026
Richardson, TX
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed