Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 8, 2026

Site work and renovation of a water / sewer project in Coleman, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Replacement of an existing 45,000 gallon welded steel ground storage tank with a new 77,000 gallon welded steel ground storage tank. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. Each bid must be submitted in a sealed envelope addressed to Bob Mann, President. Each sealed envelope containing a bid must be plainly marked on the outside as "MOZELLE PUMP STATION . GROUND STORAGE TANK IMPROVEMENTS" and the envelope shall bear on the outside the Bidder's name and address Provide materials, equipment, and incidentals required to make the project completely operable. Provide the labor, equipment, tools, and consumable supplies required for a complete project. Provide the civil, architectural , structural , mechanical , electrical, instrumentation and all other work required for a complete and operable project. Test and place the completed project in operation. Provide the special tools, spare parts, lubricants, supplies, or other materials as required for the operation and maintenance of the Project. Project includes the replacement of an existing 45,000 gallon welded steel ground storage tank with a new 77,000 gallon (25' diameter x 21 ' tall) welded steel ground storage tank..

Sub-Bidding

$265,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
15
Bidding Soon
311
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

November 9, 2026

Project location map

CR 332 & FM 1026, Coleman, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed