Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2026 at 8:00 PM

Updated September 29, 2026

Site work and new construction of an educational facility in Binghamton, New York. Completed plans call for the construction of a educational facility.

The work to be done under the Contract, in accordance with the Contract Documents, consists of performing , installing, furnishing and supplying all materials, equipment, labor and incidentals necessary or convenient for the construction of Project Number C071186, titled Student Affairs Rehearsal Facility and carry out all of the duties and obligations imposed upon the Contractor by the Contract Documents. The main features of the work shall include, but not be limited to the following: Binghamton University is seeking a qualified contractor to construct a small building that will be used by Student Affairs to host band practices. The project request was for a building that is "a little bit nicer than a garage". The project includes but is not limited to the following: 1. Site work required to provide utilities to and from the building, 2. Concrete sidewalks to provide pedestrian access and accessible route to the building, 3. New building with utility closet, 4. Mechanical work for heat and cooling, 5. Electrical work to power and light the building , 6. Plumbing work to provide minimal water and sanitary, 7. Fire alarm work to meet code. Binghamton University is seeking a qualified contractor to construct a small building that will be used by Student Affairs to host band practices . The project request was for a building that is a little bit nicer than a garage. The project includes but is not limited to the following Site work required to provide utilities to and from the building. Concrete sidewalks to provide pedestrian access and accessible route to the building. New building with utility closet . Mechanical work for heat and cooling. Electrical work to power and light the building Plumbing work to provide minimal water and sanitary. Fire alarm work to meet code requirements . Construction of a new student affairs rehearsal building including site work, utility connections, concrete sidewalks, mechanical HVAC systems, electrical, plumbing, and fire alarm systems. Question Deadline 10/02/2026 at 1:00 PM ET All questions or requests for additional information must be submitted to Binghamton University by seven (7) calendar days prior to the bid opening date.

GC Bidding

$3,700,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
101
Bidding Soon
1,876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed