Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 30, 2026 at 8:00 PM

Updated November 5, 2026

Renovation of a multi-residential development in Grande Prairie, Alberta. Completed plans call for the renovation of a multi-residential development.

Grande Spirit Foundation (GSP) is inviting bids from qualified mechanical contractors for the Sunshine Plaza Common Area Air Conditioning & Make-Up Air Unit Upgrade at 9902 - 97 Avenue, La Glace, Alberta. The project includes replacement of the existing make-up air unit, installation of a new common-area air-conditioning system, extension of conditioned supply-air ductwork to the multipurpose room, and all associated mechanical, electrical, controls, testing, balancing and commissioning work. The basis of design includes an Eng Air XE225 make-up air unit, or approved equivalent, and a nominal 4-ton common-area air-conditioning system with custom cooling coil, or approved equivalent. The work includes removal and disposal of existing equipment; ductwork modifications; refrigerant piping; condensate drainage; electrical connections; controls integration; equipment supports; penetrations and sealing; air balancing; start-up; commissioning; and project closeout documentation. The Base Bid shall include all labour, materials, equipment and services required to complete the following: 1. Remove and dispose of the existing make-up air unit and associated components that are no longer required. 2. Supply and install one new make-up air unit based on the Eng Air XE225, or approved equivalent. 3. Supply and install a complete nominal 4-ton common-area air-conditioning system, based on a 16 SEER system with custom cooling coil, or approved equivalent. 4. Integrate the new air-conditioning equipment with the new make-up air unit and existing common-area HVAC distribution system. 5. Extend conditioned supply-air ductwork to the multipurpose room, which is not presentlyserved by conditioned supply air. 6. Complete all required ductwork modifications, refrigerant piping, condensate drainage, electrical connections, controls integration, equipment supports, penetrations, sealing and associated mechanical work. 7. Complete system start-up, testing, adjustment, air balancing and commissioning. 8. Provide all required closeout and warranty documentation. New Make-Up Air Unit Installation The Contractor shall supply and install one complete new make-up air unit based on the Eng Air XE225 or approved equivalent. The installation shall include all components necessary for a complete and operational system, including, as applicable: connections to existing ductwork; duct transitions and modifications; gas connections and associated modifications; electrical connections; controls; equipment supports; vibration isolation; fastening and anchoring; insulation; sealing; required access provisions; and all incidental fittings and accessories necessary for a complete installation Electrical Work All electrical work required for the installation and operation of the new make-up air and airconditioning equipment shall be included in the Contract Price. Electrical work shall include, as applicable: . equipment power connections; disconnecting means ; breakers; associated distribution modifications; control wiring; conduit; cabling; Question Deadline Sep 29, 2026 at 12:00 PM Inquiries Contact - Justin Bristol - jbristol@grandespirit.org

Award

$98,564.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
6
Bidding Soon
83
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2026

October 9, 2026

Project location map

9902 97 Ave, Grande Prairie, AB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed