Published October 13, 2026 at 8:00 PM

Updated October 19, 2026

Site work and new construction of a water / sewer project in Aurora, Colorado. Completed plans call for the construction of a water / sewer project.

Kings Point Lift Station: The lift station consists of a 175 gallon per minute capacity facility. The facility includes a cast-in-place concrete splitter box and dual wet wells, two (2) duplex GormanRupp pump systems, odor control , interior piping and valves, instrumentation and controls, and electrical. The lift station has a CMU building with an asphalt shingle roof. In addition, the Contractor is responsible for all concrete work for the wet wells and buildings, erection of the buildings, interior finish, insulation, HVAC, electrical, and plumbing. Core Electric will provide power to the site, but the Contractor is responsible for connecting primary power and also providing the back-up generator and ATS. The scope includes a meter vault at the force mains' discharge located offsite from the lift station. Site work includes backfill, excavation, final grading, perimeter fencing, erosion control, restoration, re-seeding, yard piping, and the asphalt access road and parking area. There is an existing lift station on the site and it must maintain operation during construction until a switchover from the existing lift station to the new Kings Point Lift Station can be completed. The contractor is responsible for removing and disposing of the existing lift station components, either before or after the switchover as required. Substantial Completion shall be defined as a fully functional facility, capable of receiving and pumping wastewater as intended. The SCADA, HVAC, security, and electrical systems shall be fully operational. The Contractor must have completed to SCADA acceptance procedures with Aurora Water, which include (but not limited to): final Control Narrative, OIT approval, programming approval, Field Acceptance Test (FAT), and Site Acceptance Test (SAT). The switchover from the existing lift station and the meter vault are also part of the Substantial Completion scope Cleanup, punchlist items, site restoration, site fencing, and the onsite access road may remain for Final Completion. Questions and RFIs must be sent to Cliff Castro, Director of Land Development at Oakwood Homes, via email to CCastro@OakwoodHomesCO.com prior to 5:00 p.m. Mountain Time on Tuesday, October 6, 2026. Responses to questions and RFIs will be prepared and distributed via the link above no later than 5:00 p.m. Mountain Time on Thursday, October 8, 2026 .

Post-Bid

$3,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
124
Bidding Soon
1,619
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed