Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2026 at 8:00 PM

Updated October 12, 2026

Site work, paving and new construction of a water / sewer project in Needham, Massachusetts. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; and for paving for a water / sewer project.

The Work includes all labor, materials, and equipment necessary to furnish and install the Needham Dewatering Drainage Line. B. The major components of the Work to be performed under this Contract includes but is not limited to: 1. Installation of approximately 1,167 linear feet of 36-inch reinforced concrete gravity pipe and 76 linear feet of HDPE gravity pipe from Highland Avenue Northeast Launching Shaft site to the Charles River via Brook Road, Arlington Road and Charles Street. This includes the installation of approximately 112 linear feet of 36-inch reinforced concrete gravity pipe and associated steel casing pipe using trenchless methods. Actual dimensions are detailed on the Contract Drawings. 2. Construction of launching and retrieval pits for installation of pipeline using trenchless methods. 3. Construction of an outfall and stone bed in the Charles River The work includes furnishing all equipment, tools, materials, supervision , labor and all other items necessary to construct a dewatering drainage line of approximately 1,250 linear feet of 36-inch diameter reinforced concrete pipe that will discharge to an outfall structure to the Charles River in Needham, MA. The outfall structure will consist of an HDPE pipe on a rip-rap splash pad . The drainage line will extend east from I-5/Highland Avenue interchange below Brook Road , Arlington Road, Charles Street, and a paved surface parking lot at 163 Highland Avenue. The work will also include the removal and replacement of approximately 288 linear feet of Town of Needham vitrified clay sewer main . Upon completion, the work will include milling and overlaying the pavement from curb to curb along certain portions of the work. The estimated time frame for project completion is 517 days. Question Deadline 10/09/2026 at 3:00 PM ET Construction of a 1,250 linear foot 36-inch diameter reinforced concrete drainage line, outfall structure with HDPE pipe and rip-rap splash pad, removal and replacement of 288 linear feet of vitrified clay sewer main, and pavement milling and overlaying. Set-asides: 7% MBE, 3% WBE.

GC Bidding

$15,100,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
839
Active Projects
401
Bidding Soon
5,529
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed