Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 29, 2026 at 8:00 PM

Updated November 4, 2026

Site work for a civil project in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridge Culvert Liner Installation, Install Smooth Wall Steel Pipe Culvert and Other Work B.F. 76423 - Carrying Sherwood Park Freeway:02 over Gold Bar Creek within Edmonton NORTH CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump Sum Traffic Accommodation for Bridge Construction 38 Metre Shoring and Boring Pit Preparation 138 Metre Welded Steel Pipe - Supply 138 Metre Welded Steel Pipe - Install 109 Cubic Metre Concrete - Class S Modified 1 Lump Sum Culvert Liner - Supply 1 Lump Sum Culvert Liner - Install Contractor to supply all materials.

Bid Results

$3,171,450.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
45
Bidding Soon
591
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2026

December 1, 2026

Project location map

Multiple Locations, Edmonton, AB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed