Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 4, 2026

Site work for a golf course in Mitchellville, Maryland. Completed plans call for site work for a golf course.

Installation of sand bunkers at the Enterprise Golf Course Question Deadline 09/30/2026 All inquiries regarding this proposal are to be made to: Rocheta Locklear, Construction Procurement Specialist 6600 Kenilworth Avenue Riverdale, MD 20737 Email: Rocheta.Locklear@pgparks.com Phone: 301-699-2562 Renovations to Hole Nos. 1-18 and the Practice Facilities including the following: a. Materials and installation of erosion control features, if necessary or requested by the M-NCPPC, Contractor, or Architect. b. Stripping of existing sod, disposing in a designated area, and rototilling of remaining existing sod clumps into the top 4-6 inches of topsoil in all turf-covered areas of work. Collection and disposal of excess sod debris in an area designated by the M-NCPPC. c. Stripping and stockpiling of topsoil in all areas to be graded. d. Keeping topsoil in place following rototilling operations in Work areas to be regrassed but not graded. e. Salvaging of the sand from the existing bunkers and stockpiling for use as the sand layer for the surfaces of new teeing areas and the surface of the target green for the Practice Bunker. f. Removal of other existing materials in the areas of Work including but not necessarily limited to: irrigation system components (Holes 12 & 13 Greens only), turf, bunker drainage and sporadic fabric liner, and any other materials necessary to perform the Work. g. Transportation and placement of fill material to the necessary areas of Work. GP-6 1. The Work is designed to be performed to most features with a balance of cut/fill and no need for export or import of fill. 2. Features that will require fill material include, but may not be limited to: " n Removal of the Right Fairway Bunker at Hole 2. Removal of the Right Green Bunker at Hole 2. n n n n " Construction of a fairway bunker at Hole 3. Construction of a green bunker at Hole 4. Construction of a middle/forward tee at Hole 6. Removal of the Back Bunker at Hole 6. Removal of the Right Green Bunker at Hole 11. Reconstruction of the Green Complex at Hole 12. Renovations to Hole 18 Green Complex. 3. Fill is material needed to complete the Work is to be obtained from fill generated by performing the construction of the Work and, if necessary, from the designated borrow area at Hole 11 Tees (see Golf Course Construction Plan). 4. Features that should generate fill material include but may not be limited to: Renovation to the Left Green Bunker at Hole 3. n Removal of the Right Green Bunker at Hole 6. " Removal of the Back Green Bunker at Hole 9. n n Resurfacing of the Back and Middle Tees at Hole 11. Renovations to the Back Tee at Hole 16 An MFD subcontracting level of participation of twenty-seven percent (27%) has been established for this project. A Nondiscrimination in Subcontracting Bid Form must be completed, signed by an authorized person, and submitted with the bid in order for the bid to be deemed responsive.

GC Bidding

$600,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
617
Active Projects
203
Bidding Soon
3,953
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2026

November 6, 2026

Project location map

2802 Enterprise Rd, Mitchellville, MD

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed