Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 24, 2026 at 8:00 PM
Updated September 29, 2026
Site work and renovation of a playground / park / athletic field in Aiken, South Carolina. Completed plans call for the renovation of a playground / park / athletic field.
Installation of outfield wall and back stop padding for the university baseball field. Question Deadline 10/07/2026 at 2:00 PM ET All questions must be submitted in writing and received by the Procurement Officer Noelle Kelley Phone 803-544-1532 E-Mail Nkelley1@sc.edu Email is the preferred method for submitting questions to the procurement officer, Title the "Subject Line" of your email, "Questions GS-IFB-270039-01 USCA Outfield Wall and Back Stop Padding The purpose of this solicitation is to acquire services for labor and materials for padding on the home run fence and backstop at Roberto Hernandez Baseball Stadium at USC Aiken. The University of South Carolina - Aiken is seeking quotes for the labor and materials for padding on the Home Run fence and backstop at Roberto Hernandez Baseball Stadium. The contractor shall provide all labor, materials and equipment to manufacture and install home run fence padding and backstop padding for the full length and height of both home run fence and back stop. The approximate lengths and heights for the home run fence and back stop are: o Back Stop Wall Left and Right Ends: Left: 41 ' 9" x 4" and 5'10" x 6' Right: 41 ' 9" x 4 ' and 1'6" x 6' Middle Wall o Outfield Wall 49'3" x 4' 624' L x 8' H These measurements are estimates and the contractor shall be responsible for all dimensions of the padding to ensure proper coverage. The padding shall be 3" thick ILD polyfoam mounted on 5/8" OSB and fully wrapped with, at minimum, 18 oz solid vinyl. The new padding shall be mounted to existing fence and backstop with "Z-Clips" for easy removal by owner. The contractor shall provide "Peach Belt", "NCAA", and "USCA" logos on the backstop. The contractor shall provide "USCA Baseball", "NCAA" and other logos on the home run fence padding. On the home run padding, the contractor shall provide 5 distance marker logos and a 6" home run yellow stripe. The color of the padding shall be chosen by the owner. The contractor shall coordinate with the owner all logos, colors, and layout of the padding panels with the owner. Prior to manufacturing the padding, the contractor shall provide a sample of the padding to the owner for approval. The contractor shall be licensed to perform this type of work in South Carolina and have at least five (5) years of experience. All work shall be started within 30 days of the award, and all work shall be completed within 15 days of material delivery. All padding shall be installed prior to January 15, 2027. All work shall be performed Monday - Friday from 8:00 AM to 5:00 PM. All field conditions shall be verified by the contractor prior to ordering material to ensure components are installed correctly. The contractor shall be responsible for repairing any damage to fencing, playing surface or underground utilities that may occur due to installation of the padding. At the end of each day, the contractor shall ensure that the work site is clean and is responsible for disposable of all waste daily. The contractor shall guarantee all work performed and material for one year. Contractor shall a minimum 5 -year warranty on color of all padding from fading and sun damage and standard manufacture warranty on polyfoam.
Sub-Bidding
$75,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 19, 2026
November 18, 2026
471 University Pkwy, Aiken, SC
Related To This Project
Aiken, SC
Bid Date: Oct 12 2026
Aiken, SC
Bid Date: Oct 21 2026
Aiken, SC
Bid Date: Nov 03 2026
Aiken, SC
Bid Date: Oct 12 2026
Aiken, SC
Bid Date: Oct 01 2026
Aiken, SC
Bid Date: Oct 13 2026
Aiken, SC
Bid Date: Oct 13 2026
Aiken, SC
Bid Date: Sep 21 2026
Aiken, SC
--
Aiken, SC
Bid Date: Sep 22 2026
Aiken, SC
Bid Date: Oct 29 2026
Aiken, SC
Bid Date: Sep 15 2026
Aiken, SC
Bid Date: Sep 15 2026
Aiken, SC
Bid Date: Aug 27 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed