Published September 28, 2026 at 8:00 PM
Updated September 29, 2026
Site work and paving for a sidewalk / parking lot in Seattle, Washington. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Construct curb ramps in compliance with ADA accessibility standards. Work includes sidewalk, pavement, curb replacement, earthwork, curb ramps, signing, channelization, drainage infrastructure, landscape restoration, and other miscellaneous work. For the purpose of the Bidder Subcontractor list, this project includes rebar installation. Repair or replace existing curb ramps Restore pavement around work areas Connect repaired and replaced curb ramps to existing sidewalks and private parcels Complete drainage improvements around curb ramps as needed Complete channelization and signage improvements as needed PROJECT LOCATION : Several locations throughout the City of Seattle including North Beacon Hill, Mid-Beacon Hill, Columbia City, Brighton, and Dunlap. Engineer's Estimate: $4,500,000 to $4,700,000 Project Location: Several locations throughout the City of Seattle including North Beacon Hill, Mid-Beacon Hill, Columbia City, Brighton, and Dunlap. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Submission Deadline:October 8, 2026, 5:00pm All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188. All questions must be e-mailed and be directed to the following: Before Bid Opening: Lauren Watanabe Seattle Department of Transportation Lauren. Watanabe@seattle.gov After Bid Opening and Before Execution: Purchasing and Contracting FAS_PW_Admin@seattle.gov 206-684-0444 After Execution: Jesse Lopez Seattle Department of Transportation Construction Management Jesse.Lopez@Seattle.Gov 206-386-4612 For purposes of the Inclusion Plan, this is considered a Roadway type of project with a Past Performance of 17 Percent WMBE utilization rates based on completed projects.
GC Bidding
$4,700,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2026
December 14, 2026
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Oct 21 2026
Seattle, WA
Bid Date: Sep 29 2026
Seattle, WA
Bid Date: Sep 28 2026
Seattle, WA
Bid Date: Oct 14 2026
Seattle, WA
Bid Date: Oct 26 2026
Seattle, WA
--
Seattle, WA
Bid Date: Nov 05 2026
Seattle, WA
Bid Date: Oct 20 2026
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Sep 24 2026
Seattle, WA
Bid Date: Oct 14 2026
Seattle, WA
Bid Date: Oct 06 2026
Seattle, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.