Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 7, 2026 at 8:00 PM

Updated October 11, 2026

New construction of an educational facility in Berlin, Maryland. Design plans call for the construction of a 90,751-square-foot, two-story above grade educational facility.

A feasibility study for the Buckingham Elementary School (BES) project began in July 2022. The study documented existing building, site, and instructional deficiencies at BES and presented options to address them. In January 2023, the Worcester County Board of Education approved the construction of a replacement school on the existing site, followed by approval from the Worcester County Commissioners in March 2023. Educational Specifications were completed in May 2023, and Conceptual Planning was finalized in September 2023. After the State determined the BES replacement school project was ineligible for State funding, a BES Workgroup was formed in May 2024 to review alternatives. The Workgroup evaluated five options and recommended proceeding with construction of the BES replacement school, to be followed by a Berlin Intermediate School replacement project. This recommendation will be presented to the Board of Education on September 17, 2024, and to the County Commissioners in October 2024. In May 2025, the Worcester County Board of Education (WCBOE) and Worcester County Commissioners approved the project's Schematic Design. All information and costs included in this form are contingent upon approval by both the Board of Education and the Worcester County Commissioners, as well as the successful execution of a Memorandum of Understanding between the Commissioners and the State. The project is included in the County 2027-2031 Capital Improvement Program (CIP) Construction of a new 2 story school. The first floor is estimated at 69,387 square feet, and the second floor will likely be 21,364 square feet, for a total of 90,751 square feet between the two stories. TIMELINE: As of October 6, 2026, the Design Development and Construction Document reviews received state approval letters. An architect has been identified. Information in regard to a general contractor has not been disclosed. The new facility is expected to break ground in May 2027 and be completed just in time for fall 2029. * *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

$52,452,503.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
63
Bidding Soon
1,032
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2027

Project location map

100 Buckingham Rd, Berlin, MD

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed