Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 11, 2026

Renovation of a municipal facility in Owego, New York. Completed plans call for the renovation of a municipal facility.

Replacement of a boiler system at the Broome Developmental Center facility. Submit Job Quote Questions to Project Manager: Name: Russ Seidel Phone: 607-788-0419 Email: russell.e.seidel@opwdd.ny.gov Name: Dan Blair Phone: 607-793-7071 Email : Daniel.J.Blair@opwdd.ny.gov Replace Natural Gas Dunkirk XEB-5 Boiler in kind at 338 Barnes Creek Residence, the vendor shall provide all labor and materials necessary to complete the work in a professional manner according to this scope of work and architectural drawings if supplied . Upon completion of The Boiler Install , before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with the Maintenance Supervisor. Remove old boiler and properly dispose of it off site Install new Dunkirk XEB-5 Natural Gas boiler in the same location. Reattach the new boiler to the current Manifold & piping, gas piping. Install new exhaust system and adapt to the current wiring networks. Replace expansion Tank, Air scoop (micro bubbler), water feeder, backflow preventer. Install new ball valves to any suspect leaking valves Install new manual reset high limit control and low water cutoff as well as any parts or controls that need to be replaced at the time of the install. Add manufactures recommended anti-freeze in the new system to withstand Outdoor temperatures of -10 degrees Fahrenheit but not exceed total volume of system of 30%. Contractor shall take care to cause no damage to the house while moving materials in and out. At no time can tools, fittings etc. be left unattended because the safety of the individuals we serve is the highest priority. Installation and Service Certificate to be completely filled out upon commissioning and sent to the project supervisor via e-mail. O & M Manual(s) shall be left on site, with the house manager. Contractor shall warrantee work for a period of one year from date of payment for job. Warrantee shall be for parts and labor. Work shall conform to all applicable codes, be done according to manufacturer's instructions, and follow industry best practices.

Post-Bid

$150,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
133
Bidding Soon
1,978
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed