Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 25, 2026 at 8:00 PM

Updated October 1, 2026

Renovation of a mixed-use development in Milwaukee, Wisconsin. Working plans call for the renovation of a medical facility.

Location: Clement J. Zablocki VA Medical Center, Building 111 Main Hospital, Exterior Façade, 5000 W National Ave, Milwaukee, WI 53295. The work consists of repairing the concrete façade of Building 111 as part of the first phase of a multi-phase effort to address spalling concrete, façade cracks, and vulnerabilities to water infiltration in the existing exterior wall assembly. Work includes isolated repairs to cracks and spalls in existing precast concrete panels, installation of supplemental lateral anchorage at selected panels, replacement of sealants, and installation of flashing end dams and cavity closures at the interface between precast concrete panels and brick masonry. The project requires removal and replacement of brick masonry along the full height of the precast concrete panels to facilitate the installation of flashing and cavity closures. All existing caulk and joint sealant between the precast panels and brick masonry will be removed and replaced. The precast panels extend from grade level to the 11th-floor roof level, and the work may require the use of lift buckets, scaffolding, and swing stages. Traditional asbestos abatement is included, as testing has confirmed the presence of low levels of asbestos within affected materials. Work on each façade is to be performed during regular shift hours. The estimated construction magnitude is between $5,000,000 and $10,000,000, with a period of performance of 330 calendar days after issuance of the Notice to Proceed. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

$10,000,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
153
Bidding Soon
2,708
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2027

Project location map

5000 W National Ave, Milwaukee, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed